专科生实习报告模板.doc

  1. 1、本文档共59页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
专科生实习报告模板

哈尔滨理工大学荣成学院 专科生顶岗实习总结 年级专业: 学生姓名: 学 号: 实单位: 实时间: 哈尔滨理工大学荣成学院 完成时间: 20 年 月 日 Earth-rock backfilling of 90,000 m3. 6.2 filling large amount of planning and reclamation of the project, considering the construction of specific circumstances, mainly the following aspects: 1, good full filling arrangement and construction of roads to ensure filling the roads. 2, the main excavation, loading, transport, construction machinery, including leveling and compaction are put in good performance of construction machinery and equipment, to meet the construction needs. Earth-rock Backfilling is mainly based on general progress in the concrete construction of the main project to schedule. 6.3 Earth-rock backfilling construction of Earth-rock backfilling construction carried out in the following way: soil-stone embankment in the corresponding parts of the concrete pouring is completed, dam Foundation excavation of sand and gravel material, transported by CAT320 dig dump truck mounted 5~10T to fill parts of unloading, mechanical compacting. The Earth-rock backfilling primarily for structural backfill and site filling, relatively low requirements for compaction of backfill, the proposed CAT320 dig dump truck mounted 5~10T brought on to the site, bulldozers and tiered rolling. Layer thickness 50cm thickness of rolling a few times and identification. Local corner is supplemented by frogs Rammer and tamping. Filling quality control are as follows: (1) backfill material is not allowed in mixed clay, grass, wood, and other harmful substances. (2) the backfill material shall conform to the requirements of supervision engineer in construction drawings and. (3) the backfill material layer thickness is not too thick, should meet the requirements. (4) the compacting should pay particular attention when rolling quality backfill sand and gravel, the compact requirements. 6.4 6.4.1 construction quality guarantee measures of quality and safety measures

您可能关注的文档

文档评论(0)

almm118 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档