剪力墙结构大模板墙体钢筋绑扎工艺标准(-)(Standard for banding of steel bars in large formwork walls of shear wall structures (-)).docVIP
- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
剪力墙结构大模板墙体钢筋绑扎工艺标准(-)(Standard for banding of steel bars in large formwork walls of shear wall structures (-)).doc
剪力墙结构大模板墙体钢筋绑扎工艺标准(408-1996)(Standard for banding of steel bars in large formwork walls of shear wall structures (408-1996))
Wall steel banding process standards shear wall formwork (408-1996.Txt) there is no one like me in time to hear some songs suddenly thought of his own past _______ if I can return to the past, I will choose not to know you. I did not regret it, I cant live without you. Wall steel banding process shear wall structure of large template (408-1996)
Range
This technology is applicable to the outer plate model, wall steel banding engineering brick mold, cast-in-place template structure etc..
Construction preparation
The 2.1 main materials and equipment:
2.1.1 molding steel or mesh: according to the requirements of design drawings specifications, preformed steel mesh or spot welding.
2.1.2 reinforcement and supporting ribs with double mesh reinforcement for reinforced in two should be tied reinforcement and supporting ribs to fixed up and down about the distance between the bars. Figure 4-8 (a), (B). Tie bar in Figure 4-8 (a) in L is between two mesh distance binding vertical and horizontal spacing is not greater than 700mm. But this form of tie bar only play and not supporting role. In order to ensure the correct position of double wall mesh, the best use of the trapezoidal support ribs, as shown in Figure 4-8 (B). The trapezoidal support rib is two vertical bars (height of the same diameter with vertical reinforcement wall) into the ladder and the horizontal reinforcement welding, tied up to support role in the wall between two rows of steel bars, a distance about 1200mm. H diagram for the wall vertical rib height, h is the wall cross bar spacing, concrete wall thickness is equal to C minus the protection layer.
2.1.3 wire: can use 20 ~ 22 wire (fire wire) or galvanized wire (Qian Si).
The protective layer of concrete with 2.1.4 control mortar pad, plastic card.
2.1.5 tools: steel hook, crowbar, steel frame, steel wire brush board, lashing, trolley
您可能关注的文档
最近下载
- 沸石转轮 RTO设计方案.docx VIP
- (完整版)高标准农田建设施工组织设计.pdf VIP
- 江苏省南京市2026届高三年级9月学情调研英语试卷(含解析,无听力音频无听力原文).pdf VIP
- 人教版(PEP)六年级英语上册复习知识点.doc VIP
- 地方高校工科类微专业建设策略.pptx VIP
- 2023年湖北恩施州鹤峰县选调工作人员11人笔试历年高频考点-难、易错点荟萃-附带答案详解.docx
- 大唐集团工程管理制度.docx VIP
- 人教版(PEP)六年级英语上册复习知识点.pdf VIP
- 三洋电梯图纸VF210-VF310-VF320-VF330电气原理图纸SANYO-E-01.pdf
- 外国教育史课件.ppt VIP
原创力文档


文档评论(0)