- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
通信工程文档英文模板
PROJECT ENGINEERING FILE
ON
Project:
Construction Site:
Executive Unit:
Construction Unit: .
Pigeonhole Tine:November 10 2012
Executive Unit :(Stamp) Construction Unit: (Stamp)
Contents No. Title Page Remark I Instructions of Engineering 3 II Report on Engineering Start 4 III Report on Engineering Finish 5 IV Detail List of Engineering Statistic 6-7 V Report on Major Quality Accidents 8 VI Notice on Stand-Down or Resumption 9 VII Notice on Acceptance Test 10 VIII Name List of Acceptance Test Group Members 11 IX Certificate of Acceptance Test 12 X List of Engineering Legacies 13 XI List of Restoring Legacies 14 XII Record Of Engineering Acceptance Test Results 15 XIII Memorandum 16 XIV Blueprints of Engineering Finish 1 Route Diagram of Fiber-Optic Cable Transmission at Control/Monitoring Points 2 Top Diagram of Fiber-Optic Cable Configuration and Length 3 Top Diagram of Relay Segment 4 Compound Diagram of Fiber in Fiber-Optic Cable (Color Spectrum Table) 5 Illustrative Structure Diagram of Fiber Core in Fiber-Optic Cable 6 Diagram of Central OPS Room to Municipality Public Security Bureau 7 Map of Underground-Laid Tube Holes impropriated 8 Installation Diagram of Rack Equipments connected in Class 2 into OPS Room XV Record of Test 1 Test Record of Single-Reel Fiber-Optic Cable 2 OTDRTest Record of Fiber-Optic Cable
I. INSTRUCTION OF ENGINEERING
Project:
Executive Unit:
Construction Unit:
Outline
This Project is defined as deploying Closed Circuit Television Monitoring Center System at CCTV Monitor Center in and setting video C/M points at , and,
Engineering Schedule
Time of Engineering Start: Sep 1 2012;
Time of Engineering Finish: December 30 2012.
Engineering Duration: 60 days
Engineering Project and Personnel
Project Executive:
Project Technique Executive:
Project Quality Inspector:
Construction Personnel: 6 men
C
您可能关注的文档
最近下载
- 育种技术课件.pptx VIP
- 第14讲 晚清时期经济结构的变动与社会生活的变迁教学案.doc VIP
- 2025年数据中心800V直流供电技术白皮书(1.0).docx VIP
- 400字格子方格作文纸稿纸模板A4纸可直接打印.docx VIP
- 《导游基础知识》5-3中国古代建筑的构造之屋身与台基课件.ppt VIP
- 公司年薪制薪酬管理制度.pdf VIP
- 2025华电青海公司所属基层单位面向华电系统内外招聘180人笔试备考试题及答案解析.docx VIP
- 危重患者范围.pdf VIP
- 2024年长沙市开福区招聘社区专职工作人员真题.docx VIP
- 第3课《追求人生理想》第2框《努力把人生理想变为现实》-【中职专用】《哲学与人生》同步课堂精品课件.pptx VIP
文档评论(0)