LCLS Diagnostics and Commissioning WorkshopLCLS诊断与调试车间.pptVIP

LCLS Diagnostics and Commissioning WorkshopLCLS诊断与调试车间.ppt

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
LCLS Diagnostics and Commissioning WorkshopLCLS诊断与调试车间

LCLS Diagnostics and Commissioning Workshop Injector, Linac and Undulator Diagnostics and Beam Position Monitors P. Krejcik Context of Diagnostics in Commissioning Review scope of proposed diagnostics Emphasize that diagnostics themselves need commissioning Consider if full features (resolution, automation) are needed at beginning of commissioning Implicit sequence of commissioning: e.g. feedbacks after BPMs commissioned; slice parameters need prof. monitors and TCAVs Readiness of diagnostic systems Which SLC diagnostics should be preserved? Technology choices still being made on some new systems BPM modules – trying to attain desired resolution Prof monitor cameras – resolution, controls integration, data rate Some diagnostics are turnkey systems, others are RD projects RD still required for ultrafast diagnostics CSR THz power bunch length monitors EO bunch profiling Dynamic Aspects of Commissioning Initially diagnose a wildly mis-tuned and unstable machine Yet the same diagnostics should ultimately have finesse to optimize SASE operation Deal with imperfect and uncalibrated settings Detective work for finding hardware faults Quantify magnitude and sources of jitter Diagnostics Roadmap for electrons Accelerator System Diagnostics* 180 BPMs at quadrupoles and in each bend system Beam Position Monitoring requirements Beam Position Monitors Stripline BPMs in the injector and linac (existing) and in the LTU Differencing large numbers Mechanical precision Fabrication by printing electrodes on ceramic tubes Drift in electronics Digital signal processing Cavity BPMs in the undulator, LTU launch Signal inherently zero at geometric center C-band (inexpensive) signal needs to be mixed down in the tunnel Stripline versus Cavity BPM Signals Simplistic View of Digital BPMs Is the purely digital approach the best way to go? Must always maximize signal to noise for best resolution So eliminate any cause of attenuation: couplers, hybrids, active devices etc. This also eliminat

您可能关注的文档

文档评论(0)

189****7685 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档