Reliability-based phasormeasurement unit placement in power systems considering ransmission line-外文文献.doc

Reliability-based phasormeasurement unit placement in power systems considering ransmission line-外文文献.doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Reliability-based phasormeasurement unit placement in power systems considering ransmission line-外文文献

Reliability-based phasor measurement unit placement in power systems considering transmission line outages and channel limits Oscar Gomez1,2, Mario A. Rios1, George Anders3 1Department of Electrical Engineering and Electronics, School of Engineering, Universidad de los Andes, Bogotá, Colombia 2Department of Technology, School of Electrical Technology, Universidad Tecnológica de Pereira, Pereira 3Electrical Engineering, Technical University of Lodz, Lodz E-mail: o.gomez31@.co Abstract: Since phasor measurement unit (PMU) was invented, there has been growing interest in developing methodologies for finding the minimum number of PMUs for complete system observability. The methods for the PMU placement must consider the fact that the network topology may change when the power system is affected by a contingency event. Therefore the PMU placement problem can be stated as finding the minimum number of PMUs for complete system observability considering the failure probability of transmission lines. In this study, the authors propose a new reliabilitybased model for the contingency constrained PMUs placement. Initially, a methodology, that considers the probability of failure of the power system components, is proposed. Next, an algorithm is presented for selecting the minimal number of PMUs and their locations to monitor the system under normal operation and the most credible contingencies. A probabilistic index is introduced to select a desired level of reliability for the wide-area monitoring system. Finally, the availability of PMU measuring channels is incorporated in the model, so more realistic and useful results can be obtained. The problem is formulated and solved as a binary integer linear programming model and tested on the IEEE 9-bus, IEEE 57-bus and RTS96 test systems. 1 Introduction A phasor measurement unit (PMU) provides synchronised phasor measurements of voltages and currents from widely dispersed locations in an electric power grid. Since PMU was invented

文档评论(0)

135****6041 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档