Reliability-based phasormeasurement unit placement in power systems considering ransmission line-外文文献
Reliability-based phasor measurement unit placement
in power systems considering transmission line
outages and channel limits
Oscar Gomez1,2, Mario A. Rios1, George Anders3
1Department of Electrical Engineering and Electronics, School of Engineering, Universidad de los Andes, Bogotá,
Colombia
2Department of Technology, School of Electrical Technology, Universidad Tecnológica de Pereira, Pereira
3Electrical Engineering, Technical University of Lodz, Lodz
E-mail: o.gomez31@.co
Abstract: Since phasor measurement unit (PMU) was invented, there has been growing interest in developing methodologies
for finding the minimum number of PMUs for complete system observability. The methods for the PMU placement must
consider the fact that the network topology may change when the power system is affected by a contingency event.
Therefore the PMU placement problem can be stated as finding the minimum number of PMUs for complete system
observability considering the failure probability of transmission lines. In this study, the authors propose a new reliabilitybased
model for the contingency constrained PMUs placement. Initially, a methodology, that considers the probability of
failure of the power system components, is proposed. Next, an algorithm is presented for selecting the minimal number of
PMUs and their locations to monitor the system under normal operation and the most credible contingencies. A probabilistic
index is introduced to select a desired level of reliability for the wide-area monitoring system. Finally, the availability of
PMU measuring channels is incorporated in the model, so more realistic and useful results can be obtained. The problem is
formulated and solved as a binary integer linear programming model and tested on the IEEE 9-bus, IEEE 57-bus and
RTS96 test systems.
1 Introduction
A phasor measurement unit (PMU) provides synchronised
phasor measurements of voltages and currents from widely
dispersed locations in an electric power grid. Since PMU
was invented