三峡与金沙江下游梯级水库群发电优化调度分析-optimal power generation scheduling analysis of cascade reservoirs in three gorges and lower jinshajiang river.docx

三峡与金沙江下游梯级水库群发电优化调度分析-optimal power generation scheduling analysis of cascade reservoirs in three gorges and lower jinshajiang river.docx

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
三峡与金沙江下游梯级水库群发电优化调度分析-optimal power generation scheduling analysis of cascade reservoirs in three gorges and lower jinshajiang river

万方数据 万方数据 Abstrract The hydropower resources between the Three Gorges and the downstream of Jinsha River are abundant, which is an important river section for exploitation of hydropower resources in Yangtze River. The Three Gorges is water control project scheduling in the stem stream of Yangtze River, which is responsible for coordinating flood control, navigation, power generation, hydro-meteorological etc. Considering the factor of flood control, water supply and irrigation, the object of Jinsha River cascade hydroelectric stations is power generation. The cascade hydroelectric stations system is very large, which has more joint operation benefit and same region of power supply, providing some conditions for joint operation. There are some gaps between actual application and the research, due to the long hydropower stations construction cycle, the restrictions of predicting operation conditions and little research on stations operation. The partition of power plant and power network, bring cascade reservoir optimal operation come true provide reference for generation plan being reported to electricity grid system. Cascade stations optimal operation is a high dimensional constrained multi-objective problem with complex characteristics, such as uncertainty, nonlinear and multi-objective, etc, which is an interdisciplinary research field in hydro science and complex system engineering. However, along with the rapidly exploitation of hydropower resources, the hydraulically and electrical relationship among cascade hydroelectric stations become more and more complex, moreover, the conflicts among multiple operational objective are more obliviously. Traditional optimal operation theories and techniques cannot fully exert the comprehensive benefit of the large-scale cascade hydroelectric stations, and new joint operation and decision-making theories and methods are necessitated in present. In this research, we aim at the joint generation operation decision-making proble

您可能关注的文档

文档评论(0)

peili2018 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档