风力发电培训课程(protection2).pdfVIP

  • 6
  • 0
  • 约5.8万字
  • 约 12页
  • 2018-08-13 发布于湖北
  • 举报
风力发电培训课程(protection2)

Wind Farm University Topic No. 7-2 Protection Issues – Protection Issues – Colorado Green Colorado Green Mike Reichard May 7, 2004 Copyright© 2004 General Electric International, Inc. The Zone concept: PSCo – Lamar Sub 230kV WTG Transmission Line Zone S Transformer ∆ ∆ Transformer Zone Y Y Zone Feeder Zone Sub- Feeder Zones 2 GE EnergyGE EnergyGE Energy Wind Farm UniversityWind Farm UniversityWind Farm University GE Proprietary InformationGE Proprietary Information May 2004May 2004May 2004 Copyright© 2004 General Electric International, Inc. 1. Transmission Line Zone – Primary and Backup High Speed Schemes with DTT a. Primary – SEL-311C with fiber optic communications channel Backup – GE D60 with fiber optic communications channel b. Delta conne

文档评论(0)

1亿VIP精品文档

相关文档