温度骤降对引水隧洞衬砌结构应力影响试验分析-experimental analysis of influence of sudden drop in temperature on lining structure stress of diversion tunnel.docxVIP

温度骤降对引水隧洞衬砌结构应力影响试验分析-experimental analysis of influence of sudden drop in temperature on lining structure stress of diversion tunnel.docx

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
温度骤降对引水隧洞衬砌结构应力影响试验分析-experimental analysis of influence of sudden drop in temperature on lining structure stress of diversion tunnel

西安理工大学硕士学位论文 II 关键词:温度骤降;引水隧洞;衬砌模型;模型试验;温度应力;参数影响 本文研究得到国家自然科学基金项目的资助。 Abstract Title: EXPERIMENTAL STUDY ON THERMAL STRESS OF LINING STRUCTURE UNDER GREAT TEMPERATURE DROP IN DIVERSION TUNNEL Major:Geotechnical Engineering Name:Ke-cheng Wan signature: Supervisor:Prof. Ning Li signature: Abstract In the test section of diversion tunnel with high geothermal problem in Bulunkou-Gonggeer hydropower station, the highest temperature which monitored in drilling is 105℃, while the temperature of diversion water is about 0℃ to 10℃ during the whole year, apparently there will be great temperature difference between two side of lining structure under operation condition, which will have a significant impact on the strained condition of the lining structure.Based on the lining structure model test, simulation test of the operation condition and the overhaul condition was carried out, thermal stress distribution law of the lining structure was been studied. Some simulation of the model test has been made by using finite element method, simulation result have good consistency compared with model test result,and the temperature distribution law of the lining structure has been studied. The impact on the thermal stress and the temperature of main thermodynamic parameters has been studied. The main achievement is as follows: Based on the 2# test tunnel, some experiment on different heat insulating material has been executed, regularity for changes of temperature field and thermal stress field under different condition has been analysed. It has been proved that composited insulation materials concrete lining can reduce temperature difference between two sides of lining structure effectively, and then reduce the change of thermal stress which caused by the change of temperature. The impact on thermal stress of the heating temperature has been studied during the model test, higher he

您可能关注的文档

文档评论(0)

peili2018 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档