污水处理厂污泥电渗透-生物干化系统构建-construction of sludge electroosmotic - biological drying system in sewage treatment plant.docxVIP

污水处理厂污泥电渗透-生物干化系统构建-construction of sludge electroosmotic - biological drying system in sewage treatment plant.docx

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
污水处理厂污泥电渗透-生物干化系统构建-construction of sludge electroosmotic - biological drying system in sewage treatment plant

porosity, which makes the microbial activity more intense. And the reflux and conditioner added the higher ratio, the effect of drying is better. The temperature of treatment of turning per 48 h compared to 72 h recovered obviously. It shows that the pile should be turned when the temperature dropped first to reduce the inactivation effect of high temperature on the strain. The excessive ventilation rate would make the pile temperature too low, which weaken the water holding capacity of air. The low ventilation rate would make the less water removing due to the lower aeration rate. So the ventilation rate should be moderate. The temperature management of the bio-dying system can keep the microbial activity. And the heat generated by the microbial metabolic activity was fully used in the high temperature stage to evaporate moisture rapidly. The optimal operation parameters of the “electro osmosis-biodrying” system was: ventilation rate 0.08 m3/(h·kg), mstraw: msludge=1:5, mreflux: msludge=1:5, 2d turning frequency, temperature control points 55 ℃. The result of heat balance indicated that under the optimal condition the system ran normally, while the heat loss was more. Suggestions were given according to the heat balance. The results of control group confirmed that the sludge after electro osmosis is more suitable for biological drying than the sludge after natural drying. KEY WORDS : electro osmotic dewatering; biological drying; system construction; moisture content 目 录 第一章 绪论 1 1.1 污泥含水特性及水分形态组成 1 1.1.1 污泥含水特性 1 1.1.2 污泥水分形态组成及其性质 2 1.2 传统污泥脱水方法 3 1.2.1 污泥浓缩 3 1.2.2 机械脱水技术 4 1.3 污泥高干脱水技术 5 1.3.1 热干化技术 5 1.3.2 污泥电渗透脱水技术 5 1.3.3 污泥生物干化技术 8 1.4 本论文研究内容和意义 11 第二章 电渗透-生物干化系统的构建 13 2.1 工艺流程 13 2.2 工艺单元的设计 15 2.2.1 干化仓 15 2.2.2 干化仓进出料 16 2.2.3 干化仓供氧 18 2.2.4 混料 25 2.2.5 除臭 25 第三章 污泥电渗透过程中操作参数的影响特性分析及优化 29 3.1 试验装置与方法 29 3.1.1 试验材料 29 3.1.2 试验装置及方法 29 3.2 污泥电渗透脱水的操作参数优化研究 30 3.2.1 电压对电渗透效果的影响分析和优化 30 3.2.2 压力对电渗透效果的影响分析和优化 34 3.3 本章小结 37 第四章 污泥生

您可能关注的文档

文档评论(0)

peili2018 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档