简支箱梁桥毕业设计.doc.docx

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
简支箱梁桥毕业设计.doc

摘 要 锦州龙栖湾新区滨海桥位于辽西街、辽东街与滨海路交汇处,它的建成可以进一步拉动城市南扩,缓解新区现有桥梁交通的拥挤状况,解决其它桥梁过于拥挤和繁忙的现象,会给锦州的经济发展带来很大变化。 本桥采用预应力混凝土箱型梁桥,桥长90米,三跨结构,跨径30米,桥宽16米,为双向四车道。设计中完成桥梁在恒载、活载等引起的结构内力和变形;并且分析了预应力箱 本设计采用的是装配式预应力混凝土箱型梁桥,这种桥可以减少施工时间,而且可以充分利用机器化,可以提高工作效率,而且质量也可以提高,由于是预应力,可以有效发挥材料的性能,充分利用资源,而且可以增加桥梁的有效跨径。而且易于就地取材,所用材料价格低,外形美观,施工方便。 本设计严格遵守相关规范,以新出版的各种规范为基础,在老师的指导和帮助下,希望能顺利完成设计。 关键词:箱型梁;预应力混凝土;三跨结构;预应力钢束; The Longqiwan zone of Jinzhou located in the cross of Liaoxi street , Liaodong street and Binhai road . It built a new city can be further boost the city southward,This bridge completed will solve the other bridge built over crowded and busy phenomenon, and will bring economic opportunity to Jinzhou. The bridge is simply supported by priestessed concrete Box-beam, which is 90 meters length, three span structure , and the single-hole span 30 meters, the bridge width 16 meters width, and for the bidirectional four traffic lanes. In the design of the bridge, we have completed the following work, such as bridge structure endogen force and distortion which caused by the dead load and the live load function, and have analyzed the performance of the bridge when it is affected by the dead load and the live load stress. Simultaneously,we carry on the design calculation which to the entire bridge the pre-stressed steel ties. Design approach of the constant load, completed in live load caused internal force and deformation of the structure; The prestressed slab bridge and analysis in constant load and under the influence of live load and the mechanical properties of prestressed steel, the approach to design and calculation of the beam. The design according to the comprehensive implementation the policy, the economy, suitable, artistic, and safe, approach to the basic function request and the use premise requests.Keywords: Box-beam ; prestressed concrete ; three span structure; pre-stressed steel ties; 目录 TOC \o 1-3 \f \h \z HYPERLINK \l _Toc328060807 第一章 绪 论 PAGEREF _Toc328060807 \h 1 HYPER

您可能关注的文档

文档评论(0)

peili2018 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档