暖通英文资料.docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
专业: 班级: 姓名: 指导老师: HPAC Engineering,Dec 1, 2010 Office-Tower Hydronic Update The heating or cooling-plant replacement at a Chicago office building features electric chillers and gas boilers, Located in the Chicago Loop, the Michael A. Bilandic Building is a 21-story office tower serving State of Illinois agencies, including the Illinois Supreme Court. In 1989, the existing building structure was gutted and renovated. At that time, a new top floor was added to house major mechanical equipment, including three gas-fired, two-stage absorption chiller-heaters. Each unit had an output of 600 tons of cooling and 7,200 mbh of heating. Dedicated dual-cell cooling towers with 20-hp high or low-speed fans were installed on the roof. Since then, the chiller-heaters have been replaced with equivalent-capacity modular electric chillers and sets of duplex hydronic gas boilers. The update resulted in enhanced equipment reliability, easier maintenance, and, during the first year of operation, a 15-percent savings in measured thermal-energy use. Out With the Old The existing hydronic system clearly needed an update. With pumps mounted on the 21st floor in the vicinity of the chiller-heaters, four-pipe primary heating and cooling mains served multiple variable-air-volume (VAV) air-handling units and perimeter radiant ceiling coils throughout the building. Hydronic return mains fed into four 30-hp primary heating pumps and four 40-hp chilled-water pumps. Three of each type pumped into the respective chiller-heaters, while the fourth heating and chilled-water pumps provided manual standby duty. Likewise, four 100-hp condenser-water pumps (which since have been replaced with 40-hp pumps) took in water from the cooling-tower supply header, pumped cool water into an absorption chiller, and returned hot condenser water to a dedicated cooling tower. Because of year-round use, one chiller-heater broke down after only about 16 years of useful life and became unservicea

文档评论(0)

beifanglei + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档