In 2009, the second class construction project management and practical problem精品文档.doc

In 2009, the second class construction project management and practical problem精品文档.doc

  1. 1、本文档共9页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
In 2009, the second class construction project management and practical problem精品文档

In 2009, the second class construction project management and practical problem [construction project education network - second-class builders test question] : 1. A building, the ground floor as temporary warehouse, room according to the unified highly filled with cement, surface classification according to the load, the building is () the floor on the distribution of load on the second floor. A Line load Concentrated load Distributed load 2. As shown, a sling lifting heavy components for W, two inclined cable and artifacts into perspective for ɑ, lifting point is symmetrical, the Angle of the inclined cable internal force is the largest ɑ as (). 30 ° n. B. 45 ° 60 ° c. D. 75 ° According to the stress characteristics of reinforced concrete beams, the beams and plates are typical (). Compression of A. B. in tension C. the bending D. torsion When the height of the womens wall of a multi-storey building is more than () m, it should be added to the structural column or core-column which is anchored to the top of the roof. A. 0.50 B. 0.75 C. 0.90 D. 1.20 The steel structure is mainly made of hot rolled steel and shape steel, the minimum thickness of steel plate is greater than () mm is thick plate, mainly used for structure. 3 A. 4 B. 5 C. 6 D. 6. When the construction sites of construction control network grid form, or axis () is adopted to improve the building detail point of plane position layout is the most convenient. A. Rectangular coordinates Polar method C. Angle forward The D In the excavation of the shallow foundation pit, the top of the pit is piled with soil and building materials, and the maximum height should not exceed () m. A. 1.2 B. 1.5 C. 1.8 D. 2.0 When the brick foundation is constructed, the corner of the brick foundation and the junction should be built in the same time, and should be retained when the building is not built at the same time. A. if straight B. convex if C. concave if D. inclined if The method of observation of a certain project foun

文档评论(0)

beoes + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档