麦垛山煤矿首采面切眼支护设计优化.docVIP

  • 15
  • 0
  • 约4.17千字
  • 约 8页
  • 2018-10-06 发布于湖北
  • 举报

麦垛山煤矿首采面切眼支护设计优化.doc

麦垛山煤矿首采面切眼支护设计优化   摘要: 开切眼作为大断面支护重点工程,支护参数选择不当、顶板管控不到位容易发生顶板事故。通过对麦垛山煤矿130602首采工作面支护参数优化,切眼宽度由8.0m减小到7.7m,锚杆长度由2.2m调整为2.5m,锚杆间排距由800mm×800m间排距,调整为700mm×1000m并采用锚杆、锚索同排布置的方式提高“锚杆、锚索纵梁”受力效果,杜绝了顶板下沉、离层、底鼓、切顶等现象,快速高效完成了切眼施工。   Abstract: The starting cut, as a very important support engineering in large section, can cause roof accidents because of wrong parameter selection and abnormal coal mine roof control and management. By optimizing the supporting parameters of 130602 first coal face in Maiduoshan Coal Mine, the cut width was reduced from 8.0m to 7.7m and the anchor length was adjusted from