关州水电站横穿梅龙沟引水隧道施工的方案

关州水电站横穿梅龙沟引水隧道施工的方案      摘要:关州电站引水隧道在跨越梅龙沟时,遇见砂卵石、涌水等,随着涌水的渗透,将原密实的砂卵石层冲洗后导致松散,垮塌,导致工程难度、工期及造价相应增加,安全通过本地段的方案经设计等相关部门进行了充分研究与讨论。   Abstract: pass state electricity the station lead water tunnel at cross over plum Long Gou, meet sand egg stone, flow out water etc., along with flow out aqueous of permeate, caused after flushing at first the close-grained sand egg stone layer lax, crash, caused the engineering difficulty, work expect and cost to correspond increment, the safety passed the project of local segment through design etc. related section to carry on full research and discussion.  