广州市洲头咀隧道工程沉管段变截面管节基础处理的-研究.pdfVIP

  • 17
  • 0
  • 约11.07万字
  • 约 103页
  • 2018-11-10 发布于安徽
  • 举报

广州市洲头咀隧道工程沉管段变截面管节基础处理的-研究.pdf

Abstract Guangzhou Zhoutouzui immersed tunnel work is composed of four sections, including E1, E2, E3 and E4. E1 and 4 are designed as variable cross -section, and E2 and E3 is uniform cross- section. At present, variable cross -section tube is the first work in china, also rarely reported aboard. According to the variable cross section’s pipe water pressure distribution , pressure distribution, plate bottom sand pit development, alluvial sand plate developm

文档评论(0)

1亿VIP精品文档

相关文档