网站大量收购闲置独家精品文档,联系QQ:2885784924

大跨度公路隧道动态施工围岩稳定性数值分析-地质工程专业论文.docx

大跨度公路隧道动态施工围岩稳定性数值分析-地质工程专业论文.docx

  1. 1、本文档共132页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
大跨度公路隧道动态施工围岩稳定性数值分析-地质工程专业论文

AbstractWith Abstract With the rapid development of the state high grade construction,there are more and more highway tunnels,especially large—span highway tunnels.In the course of the hJighway tunnel’S construction,the stress in rock mass will redistribute around grotto,When this kind stress exceeds surrounding rock’S ultimate strength,surrounding rock will lose its stability and destruct. Consequently,it becomes increasingly important for the study of stability of surrounding rock and its forced condition ofthe structure during construction ofhighway tunnels. Longtoushan tunnel in Guangdong province is the largest one cave and 4-lane highway tunnel in china,which is bidirectional and detached.The biggest excavated width in construction is 21.1m,its biggest clear height is 13.2m.Associated with the project of Longtoushan tunnels,sticking to the evaluation of surrounding rock’S stability of large—span highway tunnels,in order to uphold surrounding rock’S stability and direct highway tunnel’S construction,with the combination of qualitative evaluation,quantitative evaluation,integrate and local evaluation,the paper studies the surrounding rock’S stability of tulnnels systematically. Firstly,the paper studies characteristic ofmechanics and criterion ofsurrounding rock’S stability for the large—span highway tunnels and confirms criterion of surrounding rock。S stability. Secondly,starting with the engineering geological factors influencing surrounding rock’S stability of tunnel,the paper carries on the analysis and discussion about deformation and destruction mechanism to surrounding rock,the author puts forward the strength ofrock,growth degree of discontinuity,characteristic of soft discontinuity are primary factors influencing sxwrounding rock’S stability in Longtoushan tunnel.Finally,based on the analysis of the basic theory about the interaction mechanism of surrounding rock and support structure in construction,a spatial computation model is made,a n

您可能关注的文档

文档评论(0)

peili2018 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档