网站大量收购闲置独家精品文档,联系QQ:2885784924

地铁浅埋暗挖施工引起地表沉降规律分析-土木工程建造与管理专业论文.docx

地铁浅埋暗挖施工引起地表沉降规律分析-土木工程建造与管理专业论文.docx

  1. 1、本文档共91页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
地铁浅埋暗挖施工引起地表沉降规律分析-土木工程建造与管理专业论文

西安 西安建筑科技大学硕士学位论文 西安 西安建筑科技大学硕士学位论文 Study on Law of Ground Surface Deformation in Shallow Tunnel Excavation Specialty: Civil Engineering Construction and Management Name: JING Long Fei Instructor: Prof. ZHAO Ping Abstract With the accelerated process of urbanization, a large number of people flock to the city which bring large pressure and serious city syndrome, and that caused two major congestion problems, one is traffic congestion, on the other hand is the construction of congestion. In order to solve these problems, the people began to look into the development and utilization of underground space. At present a lot of domestic city are built, being built or plan to build the subway, the rapid development caused by the urban underground engineering. Subway excavation will cause settlement of ground movement leading to varying degrees and displacement. Local the layer moving and surface deformation exceeds a certain limit, it will cause ground subsidence, pit collapsed ,tunnel destruction, damage to surrounding buildings, underground pipeline damage and other accidents, it cause serious economic losses and adverse social impact, affecting the normal use and safety of tunnels and surface buildings. Therefore, the correct prediction of surface movement and deformation caused by city tunnel construction is necessary. Elaborate background and significance of the paper topic; reviews the existing research methods and the existing problems at home and abroad based on theoretical analysis. Combined with the project example of Beijing Subway Line 7 Guangqumen to Shuangjiu range segment, theoretical analysis subway construction of the mining method caused the mechanism and the basic law of surface subsidence. Law of time effect and space distribution of surface subsidence in the engineering are obtained from the result. PECK formula for the analysis of surface subsidence distribution and Logistic model of time effects were analyzed, Method of solving each parameter of func

您可能关注的文档

文档评论(0)

peili2018 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档