网站大量收购闲置独家精品文档,联系QQ:2885784924

刚构 连续组合梁桥地震响应分析-桥梁与隧道工程专业论文.docx

刚构 连续组合梁桥地震响应分析-桥梁与隧道工程专业论文.docx

  1. 1、本文档共72页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
刚构 连续组合梁桥地震响应分析-桥梁与隧道工程专业论文

华 华 中 科 技 大 学 硕 士 学 位 论 文 II II Abstract Continuous bridges are advanced in better mechanical performance and perfect technique, but need rubber bearings with large tonnage, and large amount of maintenance work. The fixed pier of continuous rigid-frame bridges improves the mechanical performance of structure under horizontal load( such as the action of earthquake). This structure has better crossover capability, but its serviceable range is limited because of the complex stress of fixed pier. Rigid frame-continuous composite girder bridges have the advantage of both styles and overcome their disadvantage. They are particularly good in mechanical characteristics, using functions and environment adaptability, because the demand of the height of fixed pier is reduced compared to that of long unit and long span continuous rigid-frame bridges. Modern economy depends on the traffic line more and more. Once bridges - the key projects of traffic line- were ruined in earthquake, it would lead to great losses of life and property. Therefore, Seismic Response Analysis and necessary preventive measure must be taken to protecting the bridges of great importance. The calculations of rigid frame - continuous composite system girder brid ges are not defined clearly in existing seismic code. Based on relevant guidelines about seismic design in the new guidelines for seismic design, an analysis of seismic elasticity and ductility response about the Beiyilu Bridge was taken in this paper to provide basis and reference to this project, and improve theoretical and practical experience for the seismic design of later projects. Several main parts are included in this paper: With the study of Beiyilu Bridge in Urumchi, N-M-f relationship about the plastic hinge section of this bridge was programmed, Moment- curvature curve was calculated and drawn, and then transformed into equivalent Double Broken Line Model according to the guidelines. III III According to the structure characteristics

您可能关注的文档

文档评论(0)

peili2018 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档