- 5
- 0
- 约11.42万字
- 约 90页
- 2018-12-13 发布于广东
- 举报
Abstract
Withthe ofthe dedicated
developmenthigh-speed passengerrailwaylines,the
dedicated linesbecomea ofthe network
high—speed passengerrailway part existingrailway
is critical for itselfworkbetterandCan our
country’S
importantmaking improve
the isthereisnosuitable vehiclescanhavea
reality railway
transportationcapacity.But
itisusedboth lines.
intechnicalandeconomicindexeswhen on railway
goodperformance
demandforcrossline forwardthe
Inordertomeetthemarket transportation,thepaperputs
vehicles atthe ofthe
main fortheselectionof aiming requirementspassenger
parameters
these
and a ectbasedon
trainthatcrossalineinallthelinesmoves
drawingupbogieproj
main
parameters.
overall new
The followsthecrosslinevehicles goals.Adesigneddriving
bogieproject
combines with
isusedinthe drivingsystem drivingpart brakingpart.
system project.This
and simulation andthe brake
bogieproject independent
Bycalculatingdynamic analysis,the
shaft isfeasible.Atthesame loadcanreduceto17t the
drivingsystem time,axle byusing
A一1-Aaxle
arrangement.
The brak
您可能关注的文档
最近下载
- Unit 6 Nurturing nature Developing ideas(天路The sky railway)课件-高二上学期英语外研版选择性必修第一册.pptx VIP
- 建筑 工程图集14J936变形缝建筑构造.pdf VIP
- 金属非金属地下矿山紧急避险系统建设规范.pdf VIP
- 蔬菜配送蔬菜安全保障措施.doc VIP
- 隧道车行、人行横洞施工方案.docx VIP
- 中职课件:心里健康与职业生涯全册课件).pptx VIP
- 人教版七年级下册数学平行线的判定及性质证明题专题训练.docx VIP
- 2026年入党第一季度思想汇报入党积极分子思想汇报(2篇).docx VIP
- Arduino嵌入式系统应用开发全套教学课件.pptx
- DB61_T 2002-2025 窄轨旅游轨道交通施工技术规范.pdf VIP
原创力文档

文档评论(0)