《锅炉(压力容器)中水冷壁管的焊接现行质量管理的研究》-毕业论文.DOCVIP

  • 12
  • 0
  • 约2.3万字
  • 约 43页
  • 2018-12-30 发布于广西
  • 举报

《锅炉(压力容器)中水冷壁管的焊接现行质量管理的研究》-毕业论文.DOC

PAGE 精品 摘 要 本文以质量管理的理论、原则、方法为基础,首先对沈阳小型锅炉厂锅炉(压力容器)中水冷壁管的焊接现行质量管理进行研究,分析存在不完善的地方,并提出了改进措施。其次,对水冷壁管焊接过程的各个环节进行了研究,从而使焊接过程中的各个环节都达到规定的要求,把缺陷控制在其形成的早期并加以消除。持续质量改进是一个永恒的主题,质量的持续改进活动是企业发展的源动力。最后,根据锅炉中水冷壁管焊接过程中出现的质量问题,研究如何进行质量改进活动。 全文通过运用P(计划)、D(执行)、C(检查)、A(处理)四个阶段八个步骤对锅炉中水冷壁管焊接的质量管理过程进行研究与改进。通过对焊接缺陷形成的机理进行研究,根据这些缺陷形成的原因进行改进,从而减少水冷壁管的焊接接头的不合格数,接头的不合格数也达到规定的要求。对沈阳小型锅炉厂减少了些不必要的浪费,节约了资源,并为该厂减少了资金的浪费。 关键词:质量管理;焊接;PDCA循环;水冷壁管;焊接接头 Abstract In this paper it was based on the theory of quality management, principles and methods. Firstly a small boiler factory in Shenyang in boiler (pressure vessel) welding water-wall tube to study the existing quality management analysis where there is imperfect and then the proposed measures for improvement Secondly, Water-wall tubes of all aspects of the welding process has been studied so that the welding process in all aspects of the requirements to achieve control the defect formation and to be eliminated early continuous quality improvement is an eternal theme of. Continuous quality improvement activities is a source for the development of enterprises .Finally, According to the water-wall tube boiler welding quality problems arising in the course, to examine how the quality improvement activities. Full-text through the use of P (Plan), D (Do), C (Check), A (Action) in four stages eight steps to Boiler water-wall tube quality management process Research and Improve .Through the mechanism of the formation of welding defects in the conduct of research. According to the reasons for the formation of these defects improvements, Thereby reducing the failure number of the water wall tubes welded joints. The numbers of failed joints also meet the stipulated requirements. The small-scale boiler factory in Shenyang reduce some unnecessary waste of, not only saving resources, but also for the plant to reduce the waste of funds. Keywords:Quality management; welding; PDCA cycle; Water-wall tube;Welded joints 精品 目 录 TOC \o 1-3 \h \z \u HYPERLINK \l

文档评论(0)

1亿VIP精品文档

相关文档