基于dap分析的船舶分段制造流程优化-工业工程专业论文

建造流程。 3、 对各类结构化舾装件特性及其分类进行分析,特别对作业类舾装件 进行了重点研究;并对结构化舾装件与 DAP 的联系进行了分析举 例,通过安装阶段前移实现结构化舾装件的托盘优化,缩短分段建 造周期。 4、 在前文分析的基础上,研究各类典型分段的制作流程,形成典型分 段之 DAP,逐步推广到全船、全企业分段,提高单位场地分段周转 率。 关键词:分段详细组立流程;中间产品;模糊综合评判;结构化舾装件 RESEARCH AND APPLICATION OF HULL PIECE CODING BASED ON MODERN SHIPBUILDING MODE ABSTRACT Hull block assembly is a very important stage of shipbuilding. Shipyard now has a high requirement on block assembly ability with the development of shipbuilding industry and improvement of large tonnage vessels built. Shipyard in china still has a big difference on hull block assembly efficiency compared with foreign advanced yard. The period of one block building in Japan and South Korea in about 7 to 10 days, but Chinese average time is about 25 to 35 days. So it is very important to analyze the block building sequence. The design of DAP also consists of structure outfitting pars. The outfitting parts have less relation with system can be fitted during hull sub assembly and unit assembly. The main contents of this paper as follows after described the background, aim and meaning of the project: Study the character of unit assembly based on mid-product theory. Describe the piece management and movement. On this base shipyard can product with high efficiency and improve working condition: High stage working changed to plat areas; closed working changed to open areas; Reducing welding work at grand assembly stage and deformation at the same time. Take use of fuzzy comprehensive assessment based on one block model, with the parameters of fabrication work, fabrication condition, length of welding etc., analyze these parameters, choose one best building procedure from four basic procedure. Analyze the character and types of structure outfitting; analyze the relation between hull structure and structure outfitting parts with examples. Shipyard can get the result of shorting building time with structure outfitting to be fitted at forehead stages. The practice of DAP. Study differen

您可能关注的文档

文档评论(0)

1亿VIP精品文档

相关文档