华亭煤矿巷道冲击地压灾害预警研究-安全技术及工程专业论文.docxVIP

华亭煤矿巷道冲击地压灾害预警研究-安全技术及工程专业论文.docx

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
华亭煤矿巷道冲击地压灾害预警研究-安全技术及工程专业论文

S Subject : Study on Hua-ting Coal Mine Tunnel Rock burst Disaster Warning Speciaty :Safety Technology and Engineering Name : Liu Zhenguo (Signature) Instructor :Xie Junwen (Signature) Cheng Wendong (Signature) ABSTRACT As the increase of depth and strength of mining, the amount of rock burst mines mounted up. In the pillar of fully mechanized caving and mining face of 250103 mining section of Hua-ting coal mine, this phenomena is more frequent and violent causing the dangerous situation in the 250103 mining section. Therefore, the research of prediction and pretreatment method of Hua-ting caol mine rockburst contributed to improve the safety of mine. This paper firstly rockburst formed to analyze causes and impact of risk for Hua-ting coal, FLAC3D numerical simulation of simulated coal rocks of tectonic stress on the roadway impact, and comprehensive index method to determine the impact of coal and rock Hua-ting coal mine250103 working face tendencies characteristic; And 250103 working face has strong burst potential and return air crossheading shock rock burst index than transport along the slot because of the 20m width pillar. The main factors of influencing the rock burst hazard of 250103 working face are folding structure, burst tendency of coal seam, hard main roof and 20m width pillar and so on. According to the analysis of 250103 mining section, the dangerous areas are defined during the mining process of 250103 working face, and some advices on prevention design, length of working face, width of pillar and mining sequence were given . The rock burst monitoring and controlling system of 250103 mining section were constructed. The drilling cuttings method, seismological method and roof monitoring were alternately and synthetically used to inspect and forecast the burst danger. The pressure release blasting in ribs, deep-hole blasting and water infusion in roof and coal seam methods were used to reduce the rock burst danger, and the safety of 250103

您可能关注的文档

文档评论(0)

131****9843 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档