- 1、本文档共84页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
高速铁路车站进路分配问题优化研究
论文类型:应用研究
- II -
万方数据
兰州交通大学硕士学位论文
Abstract
The high-railway station is a working junction terminal and node with station track. The
size of the station carrying capacity will determine the railway network flow. Compare the
high-railway station with the existing-line passenger station, the high-railway station have
advanced technical facilities, modern mode of railway traffic organization and high quality
passenger service. On the premise of confirming train diagram, station layout and multiple
unit utilization plans, route assignment problem is an optimization study that will improve the
station carrying capacity. The route assignment scheme of automation has important
significance that will reduce the interference of artificial factors, improve the safety of the
station technical working and the station carrying capacity.
According to the actual production status of the high-railway station, the paper
constructs station network model and multi-objective programming model and it adopt
genetic algorithm to design the solving algorithm. The paper is as mainly as follows:
(1) Technical working analysis of the high-railway station. Introduce the classification of
the high-railway station and technical facilities. The paper analyzes the technical working
flow that include original MU, terminal MU, arrived MU, through MU and retraced MU. The
paper combed MU take arrival and departure track time and throat time standards.
(2) Construct the high-railway station network model. By describing the anchor and node
and join node, the paper constructs the high-railway station network model that can depict the
station’s topological structure. The paper constructs the information collection of MU
occupation that can depict route occupied situation. In the end, according to the Dijkstra
algorithm, the paper realizes detailed route collection.
(3) Construct multi-objective programming model. By defining the time slice and
throat’s time slice, constraint conditio
您可能关注的文档
最近下载
- 2019年云南省中考生物试卷.docx VIP
- 济宁普悦环保科技有限公司年产150万m2MBR膜及设备生产项目环境影响报告表.doc VIP
- 牙隐裂诊治及病例分析.pptx VIP
- 国开-组织行为学-004-机考考前复习资料.docx
- 2025年云南省西双版纳州中考模拟生物试题.docx VIP
- QB 1890-1993自行车 脚闸.pdf
- (高清版)DB3301∕T 0369-2022 城市园林树木支撑技术规范 .pdf VIP
- JJF(石化) 015-2018 实验用平板硫化机校准规范.pdf
- 数据库程序设计知到智慧树期末考试答案题库2024年秋外交学院.docx VIP
- 2024证券从业人员资格考试真题含答案.docx VIP
文档评论(0)