小型焦化厂废水处理工艺设计.doc

  1. 1、本文档共73页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
太原工业学院毕业设计 PAGE PAGE V 小型焦化厂废水处理工艺设计 摘 要:焦化污水中含有大量的氨氮以及多种有毒的有机化合物,如多环芳烃等成分复杂的化合物。从组成成分上讲,焦化污水必然会造成环境污染、影响人体健康。处理焦化污水的方法有许多,生物法以其在经济上可行性较好的特点而得到广泛应用。本文为小型焦化厂污水处理工程工艺设计。该工程,规模为5000m3/d。污水处理流程为:进厂污水从泵房到脱酚塔,然后流入隔油池,隔油池出水进入气浮池,出水进入水解酸化池,出水进入A/OO反应池,再进入二次沉淀池,二次沉淀池出水进入混凝沉淀池,最后出水。污泥的流程为:从二次沉淀池以及混凝沉淀池排出的剩余污泥进入污泥浓缩池,再进入污泥脱水间,经干化处理后外运处置。污水处理后的出水应达到《钢铁工业水污染物排放标准》(GB13456—92)中焦化行业二级标准。选择A/OO工艺处理焦化污水,在脱氮方面的效率要明显高于SBR法以及CASS氧化沟等方法。 关键词:A/OO工艺,焦化污水,脱氮 The design of small coking wastewater treatment process [Abstract] Coking wastewater contains a large amount of ammonia and a variety of toxic organic compounds, such as polycyclic aromatic hydrocarbons and other components of complex compounds. In terms of composition, coking wastewater is bound to cause environmental pollution and affect human health. There are many ways to the treatment of coking wastewater. the biological method has been widely used for its better characteristics of the economic feasibility. This article is for the design of small coking wastewater treatment engineering process. The scale of the project is 5000 m3/d. Sewage treatment process is as follows: Into the factory sewage from the pumping station to the phenol removal by the tower, and then flows into the grease trap, grease trap water into the flotation tank, the effluent into the pool acid hydrolysis, and water into the A / OO reaction cell, and then enter the secondary sedimentation tank, secondary sedimentation tank into the coagulation and sedimentation, and the final effluent. Sludge process: the excess sludge discharged from the secondary settling tank, as well as coagulation and sedimentation into the sludge thickener, and then into the sludge dewatering, then to disposal after dry processing. The treated sewage water should reach the steel industry water pollutant emission standard (GB13456-92) in two coking industry standard. Select A / OO process to dealing coking wastewater in the efficiency of denitrification was significantly higher t

文档评论(0)

a13355589 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档