定额工程费用计算程序.doc

  1. 1、本文档共10页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
定额工程费用计算程序.doc

定额工程费用计算程序 1, the unit cost calculation procedure for the quota price The serial number is called the calculated form the sum of the project base price of the fixed project fee shall be calculated according to the forecast (A) in eluding: labor S man-days consumpti on by artificial unit price (35? 05 yuan/man-days) The general measures fee (A) rate business management fee (A) rate profit (A) by profit margin other (1) + (2) + (3) + (4) + (5) + (6) + (7) artificial cost price Artificial cost price information with the norm of labor standard 35.05 yuan/man-days (+ / -) project risk can be calculated when using the fixed price differenee fee (quota project fee rate x) the actual price (or information price, price difference) of the material price and the (plus or minus) price difference between the material price in the province quota the differenee between the actual price (or the information price, the spread coefficient) and the mechanical fee (plus or minus) in the province quota the purchase fee of the material shall be calculated according to the actual situation and the time in which the material is not contained in the budget or quotation reserve gold [ (a) + (2) + (3), (4)] * rate or amount of engineering settlement according to the actual adjustment total contracting services (management) for the subcontract of professional engineering (quota project fee + general measures fee + enterprise management fees, profit) * rate rate or material purchase expense subcontract!ng or owners themselves when purchasing materials can be calculated the odd jobs fee is determined according to the actual situation production safety measures fee (8), (9) and (10) + (11), , (13) and (14) protection for vertical planes, vertical closed safety, specific standards for the level of protection frame from each city (area) construction engineering cost management mechanism according to the regulations promulgated to measure Engineering settlement, according to the construction administ

文档评论(0)

ggkkppp + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档