- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
定额工程费用计算程序.doc
定额工程费用计算程序
1, the unit cost calculation procedure for the quota price
The serial number is called the calculated form
the sum of the project base price of the fixed project fee shall be calculated according to the forecast
(A) in eluding: labor S man-days consumpti on by artificial unit price (35? 05 yuan/man-days)
The general measures fee (A) rate
business management fee (A) rate
profit (A) by profit margin
other (1) + (2) + (3) + (4) + (5) + (6) + (7)
artificial cost price Artificial cost price information with the norm of labor standard 35.05 yuan/man-days (+ / -) project risk can be calculated when using the fixed price differenee fee (quota project fee rate x)
the actual price (or information price, price difference) of the material price and the (plus or minus) price difference between the material price in the province quota
the differenee between the actual price (or the information price, the spread coefficient) and the mechanical fee (plus or minus) in the province quota
the purchase fee of the material shall be calculated according to the actual situation and the time in which the material is not contained in the budget or quotation
reserve gold [ (a) + (2) + (3), (4)] * rate or amount of engineering settlement according to the actual adjustment
total contracting services
(management) for the subcontract of professional engineering (quota project fee + general measures fee + enterprise management fees, profit) * rate rate or material purchase expense subcontract!ng or owners themselves when purchasing materials can be calculated
the odd jobs fee is determined according to the actual situation
production safety measures fee (8), (9) and (10) + (11),
, (13) and (14) protection for vertical planes, vertical closed safety, specific standards for the level of protection frame from each city (area) construction engineering cost management mechanism according to the regulations promulgated to measure
Engineering settlement, according to the construction administ
您可能关注的文档
最近下载
- 发现你的行为风格 -DISC:提高职场沟通效率 完整版.ppt VIP
- 全球数字疗法产业报告.pptx VIP
- 是谁在敲【知识精研】一年级上册音乐粤教花城版.pptx VIP
- 第2课+开放互联——网络协议与标准+课件+2024—2025学年清华大学版(2024)B版初中信息技术七年级上册.pptx VIP
- 一株双歧杆菌发酵条件的研究.pdf VIP
- 小学四年级英语校本课程.doc VIP
- 中学教育学课程.pptx VIP
- GB_T 3880.2-2024一般工业用铝及铝合金板、带材 第 2 部分力学性能.docx VIP
- 中国国家标准 GB/T 24067-2024温室气体 产品碳足迹 量化要求和指南.pdf
- 三级公共营养师基础知识考试刷题(附答案).doc VIP
文档评论(0)