多目标资源受限项目调度问题蚁群算法研究管理科学与工程专业论文.docxVIP

多目标资源受限项目调度问题蚁群算法研究管理科学与工程专业论文.docx

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
多目标资源受限项目调度问题蚁群算法研究管理科学与工程专业论文

AbstractWith Abstract With the development of society and economy,project management has gradually become a popular topic both practically and theoretically.In recent years more and more scholars have donated themselves to the research of proj ect scheduling,which belongs to the core aspect of project management一一project planning.At the beginning,the only factor considered in proj ect scheduling is time.This makes the methods solving this kind of problems,such as critical path method and proj ect evaluation and review technique,not suitable in management practice.Classic resource constrained project scheduling problem,due to its coincidence of actual proj ect by considering the limit of different resources,has been well researched as many algorithms and heuristics have been developed and implied to RCPSP.However, currently there iS very 1ittle research about multi-objective resource constrained project scheduling problem because of the complexity of the problem itself,although in the reality we often face similar situation:a project with more than one objective. In this research multi—objective resource constrained project scheduling problem with two objectives of total mal【espall and total weighted lateness is solved by using a kind of metaheuristic called ant colony algorithm which has been proved to be effective in combination optimization.It is the first time that ant colony optimization is used in solving multi..obj ective resource constrained proj ect scheduling problems.Moreover, an improved multi.colony ant algorithm is developed and also proposed and implied to multi..objective resource constrained project scheduling problem.The effectiveness and efficiency of these two algorithms are tested by comparing the results of solving Patterson’S l 10 problems with some priority based heuristics.The computation result shows the advantage and fitness of the two kinds of ant colony algorithm in solving multi.objective resource constrained project scheduling problem

您可能关注的文档

文档评论(0)

131****9843 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档