基于供电能力的城市配电网网架结构优化-电力系统及其自动化专业论文.docxVIP

基于供电能力的城市配电网网架结构优化-电力系统及其自动化专业论文.docx

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
基于供电能力的城市配电网网架结构优化-电力系统及其自动化专业论文

ABSTRACT With the rapid development of social economy and continued growth of the tertiary industry in the proportion of electricity consumption as well as the level of urbanization in China continues to improve, the development scale of the distribution network is growing, the network structure is also more and more complex, and the power load demand is also growing; especially the load density of the center business district and economic development zone increased dramatically. According to the traditional planning principles, we can meet the load demand by increasing the number of new power feeder circuits or the construction of new substations and so on, but a series of problems such as shortage of power line transmission corridor, substation distribution difficulties will follow, which leads to a serious contradiction in the use of urban land. In response to these problems, this paper proposed an optimization method of distribution tie-lines structure based on power supply capability. a model with a target function of unit power supply cost minimum considering some specific bounds of tie-lines branch length,area load demand,the number of main transformer tie-lines channel was built. In the condition of satisfying " N ?1" criterion, based on the determination method of power supply capability considering constraints of transformer overloading and tie-line capacity, Aimed at fully developing the potential of power supply capacity in the zone, This model used GA to find the optimal main transformer tie-lines branch matrix from the perspective of global optimization. It not only answerd the queestion of whether there should be tie-lines between main transformer or not” but also r gives the scheme of how to the tie-lines should be linked. The case study shows that the proposed method in this paper fully coordinate the tie-lines structure between high-voltage substation and medium-voltage grid. It can achieve the purposes of promoting regional power supply capacity

您可能关注的文档

文档评论(0)

peili2018 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档