内蒙古 内蒙古科技大学硕士学位论文 III III retaining structure, through the numerical simulation of pipe jacking construction found the influence is limited in scope to the north and south. So the removal of retaining piles have little impact on the foundation pit. The appropriate time can be chose to dismantling the retaining pile in order to save construction period which can bring economic benefits. (3) It is difficult and takes a long time to remove the portal part of the original retaining structure of reinforced concrete in the foundation pit. In this paper, optimized design with steel pipe piles to repl