能源桩换热过程中结构响应原位试验研究.PDFVIP

  • 6
  • 0
  • 约2.67万字
  • 约 9页
  • 2019-02-28 发布于湖北
  • 举报

能源桩换热过程中结构响应原位试验研究.PDF

See discussions, stats, and author profiles for this publication at: /publication/286999027 In-situ tests on structural responses of energy piles during heat exchanging process Article  in  Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering · June 2014 DOI: 10.11779/CJGE201406014 CITATIONS READS 6 154 2 authors, including: Xiaohui Cheng Tsinghua University 60 PUBLICATIONS   558 CITATIONS    SEE PROFILE Some of the authors of this publication are also working on these related projects: THM coupled constitutive modeling of geomaterials View project Numerical limit analysis on suction caissons View project All content following this page was uploaded by Xiaohui Cheng on 06 July 2016. The user has requested enhancement of the downloaded file. 第 36 卷 第 6 期 岩 土 工 程 学 报 Vol.36 No.6 2014 年 .6 月 Chinese Journal of Geotechnical Engineering June 2014 DOI :10.11779/CJGE201406014 能源桩换热过程中结构响应原位试验研究 1,2 1 桂树强 ,程晓辉 (1. 清华大学土木工程系,北京 100084;2. 长江勘测规划设计研究院,湖北 武汉 430010) 摘 要:目前关于在桩基中埋设换热管作为地源热泵换热器 (即所谓 “能源桩”技术)在制冷或供暖过程中对结构和 周围岩土体的影响的信息十分有限。在河南省信阳市一项地源热工程中开展了保持桩顶加载条件下施加温度荷载并进 行桩身结构响应量测的试验。试验持续了 4 周的时间,在常规静载试验的基础上叠加了温度循环,以模拟能源桩在实 际运行时的工况。沿桩身深度方向布设了振弦式应变计和其它量测仪器,获取了桩身的应变和温度曲线剖面。同时获 得了桩顶加载量、桩顶位移、桩身中换热管的进出口水温以及环境温度等数据。从这些数据中又推导出桩身的附加温 度荷载。在此试验的基础上,又探讨了能源桩结构响应的简化规律。对桩体进行加热或制冷后,桩体中相对于结构加 载产生了附加温度荷载 (拉力或压力),且受制于桩端和桩周约束,结构荷载和温度改变引起的附加荷载的合力可能 会超出桩基设计规范的限值,在能源桩设计中应给予充分的考虑。

文档评论(0)

1亿VIP精品文档

相关文档