- 1、本文档共20页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Outstanding Items for rig acceptance
PAGE \* MERGEFORMAT 19
Legend
? OK – Result is acceptable.
? NAC – Result is not acceptable. Test result deviates from the accept criteria and/or test objective (Note: NAC to be used together with CAR or MOD).
? CAR – Corrective action requested. Test result is not in compliance with regulatory requirement or specification. Corrective action is to be taken by Contractor as soon as defined. Test may have to be repeated.
? MOD – Modification requested. Test result may identify needs for modification to system, equipment, tool and/or procedure prior to compliance with drilling operation requirements.
? TBVO – To be verified in operation. Test may not be verified due to practical reasons or not being able to implement modification in due time.
? REC – Recommendation to adjust. Test result within acceptable deviation from specified accept criteria, but to improve operational efficiency and obtain cost saving, adjustment to systems, equipment or procedures can be proposed.
2.2 Visual Inspection
8 Check that all equipment is explosion proof in accordance with the classification of the area. ( Exp. ) CAR
9 Check that this equipment is earthen ( Exp. ) CAR
10 Inspect position and appearance of extinguishers, hydrants, axes, SCBAs CAR
M4 Are muster lists/station bills displayed in all accommodation areas? CAR
Hazardous zones, electrical equipment
Ensure that all equipment permanently placed in hazardous areas is recorded in the PM system and check that regular PM tasks are performed and recorded.
Earth bonding records
M9 Have sample checks been made of equipment earth bonding conductors to verify the earth continuity path
M10 How often is the earthing bonding tested? Check records.
4.12 Watermaker
Item Description of Task Acceptance
1 Verify that capacity is as per specification of annex A, in normal drilling mode. Not tested
2 Check if potable water tank is clean (or confirm water quality has been tested) N
您可能关注的文档
- 组织系统格言..doc
- 组织学与胚胎学课件——神经组织 (1)..ppt
- 组织中的群体行为(4)..ppt
- 组织中的信息系统..ppt
- 组装公差分析..doc
- 组装计算机从选购到软硬件安装全过程..doc
- 组装流水线效率提升报告..ppt
- 祖国的钢铁长城..ppt
- 祖国统一大业-你可知“Macao”不是我真姓?我离开你太久.....ppt
- 钻工培训资料..pptx
- 安全生产考核奖惩制度3篇.doc
- 颅脑损伤病人的护理查房【优质公开课】精品PPT课件模板.pptx
- 二零二二年度德州继续教育公需科目《公共事务管理与服务能力》试题及答案.pdf
- 二零二二年度党风廉政建设知识竞赛题库(含答案).pdf
- 二零二二年度度枣庄市专业技术人员继续教育公需科目培训班互动题.pdf
- 二零二二年度儿童保健学试题库(含答案).pdf
- 二零二二年度第十九届中国东南地区数学奥林匹克竞赛高一试题(含答案).pdf
- 二零二二年度动物卫生监督题库(含答案).pdf
- 黑龙江省大庆市重点中学2023-2025学年高一下学期2月开学考试英语试题(含解析).docx
- 二零二二年度法检书记员招考《公基》测试题库(含答案).pdf
文档评论(0)