网站大量收购独家精品文档,联系QQ:2885784924

钻井平台验船大纲.docx

  1. 1、本文档共20页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Outstanding Items for rig acceptance PAGE \* MERGEFORMAT 19 Legend ? OK – Result is acceptable. ? NAC – Result is not acceptable. Test result deviates from the accept criteria and/or test objective (Note: NAC to be used together with CAR or MOD). ? CAR – Corrective action requested. Test result is not in compliance with regulatory requirement or specification. Corrective action is to be taken by Contractor as soon as defined. Test may have to be repeated. ? MOD – Modification requested. Test result may identify needs for modification to system, equipment, tool and/or procedure prior to compliance with drilling operation requirements. ? TBVO – To be verified in operation. Test may not be verified due to practical reasons or not being able to implement modification in due time. ? REC – Recommendation to adjust. Test result within acceptable deviation from specified accept criteria, but to improve operational efficiency and obtain cost saving, adjustment to systems, equipment or procedures can be proposed. 2.2 Visual Inspection 8 Check that all equipment is explosion proof in accordance with the classification of the area. ( Exp. ) CAR 9 Check that this equipment is earthen ( Exp. ) CAR 10 Inspect position and appearance of extinguishers, hydrants, axes, SCBAs CAR M4 Are muster lists/station bills displayed in all accommodation areas? CAR Hazardous zones, electrical equipment Ensure that all equipment permanently placed in hazardous areas is recorded in the PM system and check that regular PM tasks are performed and recorded. Earth bonding records M9 Have sample checks been made of equipment earth bonding conductors to verify the earth continuity path M10 How often is the earthing bonding tested? Check records. 4.12 Watermaker Item Description of Task Acceptance 1 Verify that capacity is as per specification of annex A, in normal drilling mode. Not tested 2 Check if potable water tank is clean (or confirm water quality has been tested) N

文档评论(0)

586334000 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档