基于施工组合缺陷的预应力箱梁试验研究和力学分析-结构工程专业论文.docxVIP

基于施工组合缺陷的预应力箱梁试验研究和力学分析-结构工程专业论文.docx

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
郑州大学硕士学位论文Abstract 郑州大学硕士学位论文 Abstract ne box beam is ofthe most beam pre-s缸essed concrete bridge one popular bridge structures.With the deeply developing of the traffic and the transportation,massive prestressed concrete box beam bridges have been bullded in recent years.At the same time,it is occurred of various quality problems on the pre-stressed concrete box beam bridges.According to the results from statistics and the analysis,one of the main reasons ofthe quality problems is fiom the constructional deficiency. Theoretical analysis,experimental validation and engineering practice are the three pillarsofthe establishment and development ofstructural engineering.Aone-halfscale modle of the 30m prestressed concrete box beam was built,and the deficiencies on the pouring and vibrating of concrete and the tensioning of pre·stressed wires were specified.Then test beam with given assembled deficiencies Was made.Through the dead load destructive test on the deficiencying beam,the loading proess and the destructional form of the beam Was detected,and the influence of the constructional deficiency on the beam was analysised.Further more,a 3D finite element analysis on the deficiencying beam was done to compare witll the test results of the deficiencying beam. According to the conu”dst analysis result of the dead load destructive test and the finite element analysis,the following conclusions was obtained: l、11璩given deficiencies are not much influace to the beating capacity of the deficiencying beam.According to Code for Design of Highway Refmforeed Concrete and Prestress Contrete Bridges and Culverts.11圮ratio of the actual limit bearing capacity to the theory value is 1.77,and there is more safety capecny wim the deficieucying beam. 21 n圮given deficiencies can much influnce to the durability of the deficiencying beam.Because of the less of a tensioning of pre-stressed wire at one side of the beam, the crocks apeared and developed early on the same side.It could expected

您可能关注的文档

文档评论(0)

peili2018 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档