- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Abstract
Bridge engineering is playing an increasingly important role in our daily lives, also along with it, we have a lot of problems. As a major research topic, bridge construction monitoring is a matter with difficult and complex. However, the monitoring of bridge relates to the bridge force is reasonable and the design requirements of linear. It has a significant impact on healthy operation after the bridge is done. Therefore, the bridge construction project monitoring is an important aspect which is can not be ignored.
In this thesis, we use the evaluation method after the bridge is done, with the projects
which have been done, The success of the gray theory to practical engineering. With Predictor variables which is rational choose, we selected variables on the grey forecasting model. Being compared with the Structure calculation of the use of the software MIDAS / CIVIL simulation and theoretical values derived from actual projects in the measured values , then obtained corresponding conclusions.
As a nonlinear system, the force and linear of bridge structures is affected by many
aspects such as the temperature, environment and so on. However, these factors were often overlooked in calculation of the structure, It makes the calculation results is the large deviation from the actual situation. As a forecasting system, It filters a lot of factors on the structure, do not have too much care about the reasons for the structure. Meanwhile, we have the gray prediction model with less gray prediction data , predictive control is also more convenient. Based on the theory of gray system, we can know the grey system theory in bridge construction monitoring with high availability. While the gray prediction theory results to the results of our simulation analysis in line with the amendments to be well.
Finally, we also make the prospect in the future of bridge construction monitoring
with grey theory , and some issues are raised. We hope that the gray system theory wha
您可能关注的文档
- 计及限风特性与经济性的储能系统容量配置研究-电气工程专业论文.docx
- 环氧酸化碳纳米管玻纤微纳复合材料的制备工艺及性能-化学工程专业论文.docx
- 集氡罩参数对氡析出率测量的影响研究-核科学与技术专业论文.docx
- 黄河三角洲典型湿地表观土壤呼吸通量及有机碳矿化动态模拟-环境科学专业论文.docx
- 环氧树脂乳化剂的合成及其水性导电防腐涂料的研制-无机化学专业论文.docx
- 环卫车焊装夹具CAD系统的关键技术研究-机械制造及其自动化专业论文.docx
- 黄兴、蔡锷逝世及其影响-中国近现代史专业论文.docx
- 黄啸侠拳法的分析-体育学;民族传统体育学专业论文.docx
- 黄土高原矿区4种草本植物对干旱胁迫的生态适应性研究-生态学专业论文.docx
- 黄河侧渗水除砷技术研究-市政工程专业论文.docx
最近下载
- 2025青岛版小学科学三年级上册1-5《制作动物分类图册》(教学课件)(新教材).pptx
- 标准图集-17J008 挡土墙(重力式、衡重式、悬臂式) 无水印.pdf VIP
- JJF(陕) 048-2021 一体化振动变送器校准规范.docx VIP
- 退药申请单.doc VIP
- 2025年中国镁铝尖晶石行业投资前景及策略咨询研究报告.docx
- 农牧民培训国家通用语言.pptx
- 2022年度国铁集团质量安全红线检查迎检实施方案(最终版) (2).pdf VIP
- 六年级数学上册第一单元圆基础测试题北师大.doc VIP
- (高清版)B/T 42584-2023 信息化项目综合绩效评估规范.pdf VIP
- 《建筑给水复合管道工程技术规程》CJJ@T155-2011.pdf VIP
文档评论(0)