荒漠戈壁地区高等级公路交叉口间距分析-桥梁与隧道工程专业论文.docxVIP

荒漠戈壁地区高等级公路交叉口间距分析-桥梁与隧道工程专业论文.docx

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
西安建筑科技大学硕士学位论文 西安建筑科技大学硕士学位论文 西安建筑科技大学硕士学位论文 西安建筑科技大学硕士学位论文 Studies on the Highway intersection spacing of Desert and Gobi area Specialty:Bridge and Tunnel Engineering Postgraduate: DuanYing Instructor:Prof.Tong Shenjia ABSTRACT Highway intersection is the most dangerous place of the traffic accidents,and one of the restrictive factors is that the building of intersection spacings is not unreasonable. Intersection spacing is one of the critical variables affecting roadway safety and operation.For the desert and gobi highway,because of the special the geographic environment and climatic factors,it has unfavorable influence to driving characteristics, and the probability of traffic accident is much bigger than common area highway. Setting up the suitable highway intersection of the desert and gobi highway is not only beneficial to improve the roadway safety and operation of the desert and gobi highway, but also protect design functions and extend the life span of the desert and gobi highway in these areas.All these can be raise the traffic management and energy savings etc. Nowadays our country has not develop studying of intersection spacings in the desert and gobi areas comprehensively,and related standards and codes are not imperfect,and the phenomenon that the arbitrarily break of the desert and gobi highway is serious(for example,villages corresponds to their own highway intersection and access),which affects use function of the desert and gobi highway. This thesis study the highway intersection spacing of the desert and gobi highway from both the theory calculation and simulation analysis.First,starting from the influence of factors of driver’s driving characteristics and comparing with the driver’s reaction time in common area and city area,the article can derive the driver’s reaction time in the desert and gobi areas using the step analysis.Second,according to the Access Management Technology and making the classification of plane intersection and Highway inte

您可能关注的文档

文档评论(0)

131****9843 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档