- 24
- 0
- 约10.83万字
- 约 77页
- 2019-06-25 发布于江苏
- 举报
ABSTRACT
entropy weighting analysis method; Based on cloud theory, realized the qualitative
quantitative uncertainty transformation based on cloud model, can reflect such as
randomness and fuzziness in the process of evaluation uncertainty problems. Assisted
by fuzzy entropy E as the contestant, jointly build the grade evaluation of slope
stability of two-dimensional evaluation model.
(5) On the basis of the analysis of the whole earth and rockfill dam risk system,
and from the perspective of risk assessment, considering the engineering quality,
operation management, flood control safety, structural safety, seepage safety,
earthquake and related factors of metal structure, constructs the comprehensive
evaluation index system of earth and rockfill dam risk; Established the index system
of qualitative and quantitative indexes of quantitative standard; The integrated use of
analytic hierarchy process (ahp) and fuzzy analysis theory, is proposed based on
analytic hierarchy process (ahp) of earth and rockfill dam risk fuzzy comprehensive
evaluation method.
Key words: earth and rockfill dam, Overtopping, slope, the comprehensive
evaluation
III
目 录
目 录
第一章 绪论1
1.1 研究的目的和意义1
1.1.1 研究的背景1
1.1.2 研究的目的和意义1
1.2 研究现状2
1.2.1 国内土石坝风险分析研究现状2
1.2.1 国外土石坝风险分析研究现状4
1.3 问题的提出4
1.4 本文所做工作和章节安排5
第二章 土石坝服役风险成因辨识与挖掘7
2.1 概述7
2.2 土石坝风险成因识辨分析7
2.3 土石坝风险潜在成因故障树挖掘方法8
2.3.1 故障树分析法9
2.3.2 故障树的建
您可能关注的文档
最近下载
- 合成生物学教材配套电子课件完整版电子教案.pptx
- AGMA 2000--A88-中文翻译版本.pdf VIP
- TwinSAFE EL6900 安全模块基础使用指南(针对TC3.1.4020.0版本).pdf VIP
- ISO22163-2023内审员审核技术培训.pdf VIP
- 提高钻孔灌注桩成孔质量一次验收合格率.docx VIP
- (完整版)放射工作人员培训考试试题(附答案).docx VIP
- 习题答案数字电路与系统设计 (8).docx VIP
- 小学科学四下作业本(浙江).pdf VIP
- 标准图集-中南11ZJ111 变形缝建筑构造.pdf VIP
- 精品解析:江苏省苏州市吴中区2025年中考二模考试英语试题(解析版).docx VIP
原创力文档

文档评论(0)