PFMEAs/Control Plans and 8-Ds During APQP PFMEAs should be driven by real data, including 8-Ds (internal and external), warranty and returned part analysis PFMEAs should be completed by process experts and should be a driver of the control plans and work instructions Work instructions (Post control log, process parameter logs, preventive maintenance, etc.) implement the control plan in the process When there is a quality problem there is an opportunity to improve the control plan and the work instructions APQP Links to Control Plan Control Plans Includes product and process special characteris