- 1
- 0
- 约3.13万字
- 约 22页
- 2019-09-06 发布于江西
- 举报
Team # 13544 Page PAGE 20 of NUMPAGES 22
PAGE
Dedicated?Pipeline?for?Trip?Arrangement
Summary
In the problem of camping, we should set reasonable schedule which can not only increase the utilization of campsites but also meet peoples needs. Meanwhile, the carrying capacity of the river is also required. To solve the problem, this thesis will build optimization model with maximum campsites utilization and river trips as the models target function.
The specific steps are as follows:
step1: Determine the number of campsites Y. We use Computer Emulation Simulation to solve this problem by making full use of the given conditions that trips will spend6 to 18 nights on the river and the river is 225 miles long. We get 29 sets of data through programming, then curve fitting them by SPSS software. By comparing the value of sig. and adjusting R square and so on, the ideal number of the campsites is got .
Step2: By using the number of the campsites 39 as well as the goal programming equation built in the first step, we get the number of river trips that are allowed to enter, namely the carrying capacity of the river.
Step3: By using the campsites 39, we adjust the campsites of different camping program and then divide them into 4 kinds through clustering analysis using SPSS. Then we select representatives in various types of camping programs according to repetition rate and the average transfer rate. So we streamline the camping programs into the problem of goal programming for 6, 8, 11, 12, 16 nights.
Step4: In those five camping programs, 39 campsites which will not repeat are distributed in 3 dedicated pipelines . The first line accounts for 12 campsites and can only be available for 6 or 12 nights trip. Each day, a couple of 6 nights trips are distributed, and the starting trip camps the campsites in turn according to the even number of the pipeline while the secondary tri
您可能关注的文档
- SaaSBB.com平台及服务介绍.ppt
- 白音华汽轮机扣盖方案.doc
- lpj_-索芙特媒介策划.ppt
- 安达信-小天鹅项目管理分析报告全案之附录8、组织评估调研问卷分析.ppt
- 2010驾照考试模拟试题.doc
- XX集团有限公司绩效管理体系调研诊断报告(PPT 29页).ppt
- 2012福建统一冰糖雪梨活动策划.ppt
- xxx综采工作面回收措施.doc
- NO5 管理研究方法,管理与其他学科的关系及研究基础.doc
- 奥美广告培训资料.ppt
- 中国国家标准 GB/Z 37551.300-2026海洋能 波浪能、潮流能及其他水流能转换装置 第300部分:河流能转换装置发电性能评估.pdf
- GB/T 44937.3-2025集成电路 电磁发射测量 第3部分:辐射发射测量 表面扫描法.pdf
- 中国国家标准 GB/T 44937.3-2025集成电路 电磁发射测量 第3部分:辐射发射测量 表面扫描法.pdf
- 《GB/T 44937.3-2025集成电路 电磁发射测量 第3部分:辐射发射测量 表面扫描法》.pdf
- 中国国家标准 GB/T 44937.1-2025集成电路 电磁发射测量 第1部分:通用条件和定义.pdf
- GB/T 44937.1-2025集成电路 电磁发射测量 第1部分:通用条件和定义.pdf
- 《GB/T 44937.1-2025集成电路 电磁发射测量 第1部分:通用条件和定义》.pdf
- 中国国家标准 GB/T 4937.37-2025半导体器件 机械和气候试验方法 第37部分:采用加速度计的板级跌落试验方法.pdf
- 《GB/T 4937.10-2025半导体器件 机械和气候试验方法 第10部分:机械冲击 器件和组件》.pdf
- 中国国家标准 GB/T 44937.2-2025集成电路 电磁发射测量 第2部分:辐射发射测量TEM小室和宽带TEM小室法.pdf
原创力文档

文档评论(0)