- 4
- 0
- 约1.35万字
- 约 43页
- 2019-09-12 发布于浙江
- 举报
* Slide 8-* In general, both VBE and VBC are present : In saturation, the BC junction becomes forward-biased, too. VBC causes a lot of holes to be injected into the collector. This uses up much of IB. As a result, IC drops. VCE (V) 8.6 Ebers-Moll Model Modern Semiconductor Devices for Integrated Circuits (C. Hu) Slide 8-* 8.7 Transit Time and Charge Storage When the BE junction is forward-biased, excess holes are stored in the emitter, the base, and even in the depletion layers. QF is all the stored excess hole charge tF determines the high-frequency limit of BJT operation. tF is diffi
您可能关注的文档
- 《有趣的不倒翁》.ppt
- 《幼儿期的心理发展》.ppt
- 《幼儿卫生与保健》模块四.ppt
- 《渔父》形象探究.ppt
- 《渔业资源评估》.ppt
- 《与朱元思书》用.ppt
- 《雨霖铃与声声慢对比教学》.ppt
- 《语言文字应用·词语的兄弟姐妹——同义词》.ppt
- 《宇宙的边疆》公开课.ppt
- 《元朝的统一局面》元朝的统治与民族关系的发展.pptx
- 4、回填施工记录表.XLS
- 2、原材料、构配件进场使用检查记录表.xls
- 1、CK0+600~ CK0+700 水泥混凝土面层.XLS
- 1、CK0+000~CK0+200 AC-20C下面层(下洒透层油).XLS
- 1、工程材料进场使用清单.xls
- 2、4%水泥稳定石屑下基层(CK0+200~CK0+400)200米为一检验批(报验表).XLS
- 1、4%水泥稳定石屑下基层(CK0+000~CK0+200)200米为一检验批(报验表).XLS
- 5、CK0+800~ CK0+860左侧路缘石_重命名_2017-1-17-11-35-12.XLS
- 2、CK0+700~ CK0+860 水泥混凝土面层.XLS
- 022、CK0+200~CK0+400 AC-13C上面层(下洒粘层油).XLS
最近下载
- 城市轨道交通票务管理--说课.pptx VIP
- 基于PLC小型的小型吊车控制系统设计与分析.docx VIP
- JJF 2283-2025 电子叉车秤校准规范标准立项发展报告.docx VIP
- 年产户外服装面料6000万米、PVC压延布5000万米生产线改扩建项目环境影响报告书.doc VIP
- 石油炼制与石油化工PPT课件.pptx VIP
- S206嘉善至余姚公路平湖段改建工程(规划九曲港路至乍王线段)环境影响报告书.pdf VIP
- 生物化学教程(王镜岩)课后习题答案解析.pdf
- 推拿治疗LDH的作用机制和研究进展.pdf VIP
- 2026年初中成语故事《方枘圆凿》楚辞矛盾哲理教案.docx VIP
- ATBM253 Data Sheet v1.3 (电视高频头芯片).pdf VIP
原创力文档

文档评论(0)