替代料逻辑与PLMSAP作业方式.pptVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
替代料邏輯與PLM/SAP作業方式 Concept RD set inter-replaceable part within one group Part will be inter-changed in the same group SAP will automatically choose part according to the ATP of parts. Expected Benefits Better material utilization and control Fully utilize the replaced parts. Increase material turnover rate Replaceable parts use automatically Decrease ECO numbers RD maintain the replaceable relationship between parts Multi-site production with one time setting Minimal part preparation L/T BOM configuration flexibility Board product: Mosfet, TTL/CMOS IC, Diode, Transistor… System product: HDD, ODD, Memory… ECOM Analysis If demand is 20, substitute will be If demand is 30, substitute will be PLM系統建立替代料作業方式 透過ECOP或ECOM 來定義專案用料之替代關係 ECOP? EVT/ DVT階段的工程變更 ECOM?PVT/ MP 以後的工程變更 ECOP/ ECOM替代關係之設定 Key fields: Find num, Qty, Ref Des (Location). Find num (Group): define the Alternative Group (1~256) Primary Item: maintain Qty Ref Des Alternative items: Qty=0 Ref Des keep Empty Milestone Review Notice ECO Cut in implement “Running change” definition For those running change can’t be substitute NOT to set the substitute relationship in BOM. controlled by PMC manually. For the running change can be substitute and no concern to the current or next batch Just leverage the substitute function can achieve the purpose. Select Reason Code as “Company Policy” For the ECOM only set substitute part relationship, please select reason code as company policy and attach test report. Notice As T product BOM is saved from standard product, if the substitute part relationship needs to be removed in T product, PM should clearly mark it in T product EXCEL sheet. Then, PE may create correct BOM according to the Excel sheet. Substitute part rule (1/2) Due to R/C parts have already at least 1 second source approved in the same part number, it is not necessary to use the function again unless single source part like NOKIA project. Following part category including L, Mosfet, TTL/CMOS IC, Diode, Tr

文档评论(0)

95323 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档