;;New Antioch Bridge. This high-level bridge completed in 1979 replaced an older truss-type lift bridge crossing the main shipping channel. The bridge consists of continuous spans of variable depth in Cor-Ten steel. Maximum span is 460 ft, and maximum height of roadway above water level is 135 ft. (California);Elevated highway. Taken during construction. Designed as concrete box girders, these bridges were cast in place and post-tensioned. (Vienna, Austria);Highway interchange structure. Spans are all multi-cell reinforced concrete box girders. Being stiff in torsion, these sections can be sup