喀北电站汽机资料 汽水系统流程图 BOILER HP LP TURBINE Gland Seal cooler deaerator 排汽凝结成的凝结水被热水井收 集后,由凝结泵升压,经轴封冷 却器、低加进入除氧器,这部分 的设备及连接管道就组成了凝结 水系统。 After condensate water is collected by hot well, it is boosted by condensate pump, then is goes through gland seal cooler, LP heater and deaerator, equipment and pipes in this section form condensate water system. 喀北电站汽机资料 LP CONDENSER Gland Seal cooler deaerator pump 排汽凝结成的凝结水被热水井收集 后,由凝结泵升压,经轴封冷却器、 低加进入除氧器,这部分的设备及 连接管道就组成了凝结水系统。 After condensate water is collected by hot well, it is boosted by condensate pump, then is goes th