安达信咨询方法与工具资料库ISS.DOCVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
ARTHUR ANDERSEN PAGE3 Arthur Andersen Co, SC Date: TIME \@ d MMMM yyyy 25 September 1995 Subject: Issues to resolve before System Test can commence ARTHUR ANDERSEN Arthur Andersen Co, SC To: Frank Zahra Damian Walsh Damian Armour From: Tim Grosser Date: TIME \@ d MMMM yyyy 25 September 1995 Subject: Issues to resolve before System Test can commence High Risk Areas Finalise Micros - this is nearly completed Map check to micros Receive BMS import files. PDT’s Issues We will use the test data that has been set up for training. The machine download into the CDR is part of the test plan The partial coin count (PPC) will not be tested in this phase as the CDR is not ready for PPC. JD to obtain required coins from Craig McMaster Conclusion The core PDT testing looks on time and should be setup/operating OK, assuming we can get the coins within 1/2 a days notice. The PPC will not be operating for the System Test. Dollar Dealers Issues We need to define who is to install the DD equipment (including the DD, MPC , etc) When it is to be installed JD to obtain required coins from Craig McMaster, we have sent him a memo, but he has not yet received it. Conclusion I do not know the status of when the DD’s will be installed. I need to find this out from Joe Cronin. Attraction Revenue Issues DW to talk to VW re: when will their equipment be ready to include within the test. As a temp measure we can create an import file, but this is not a real system test. Conclusion Similarly I need to talk to the Compass installers to know when their system will be in a position to export a revenue file. BMS Issues Need to get an import file from BMS, Brett will organise this today or tomorrow. We need to get a time and date from Brett as to when this export file will be ready, PVAACT.SC3 Conclusion We need to talk to Brett urgently to get some times and dates for the export file, as it is an important part of the labour/sales reports from the CDR. In addition this is a complicated iss

文档评论(0)

qinghe1 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档