- 1、本文档共23页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
METHOD STATEMENT FOR BATCHING PLANT ERECTION WORKS
DISCIPLINE
Civil
Mechanical
Electrical
General
?
?
?
Contact
Document control
NAME:
M.S for Batching Plant Erection Works
Tel:
Action Required
For information
For Approval
?
Contents
TOC \o 1-3 \h \z \u 1. PURPOSE 5
2. SCOPE 5
3. REFERENCES DOCUMENTS / SPECIFICATION / STANDARD 5
4. RESPONSIBILITIES: 5
5. MACHINERY, TOOLS, EQUIPMENTS AND MATERIALS 8
6. MATERIALS 9
MACHINERY, TOOLS, EQUIPMENTS AND MATERIALS 9
7. WORK METHODOLOGY 9
7.1GENERAL 10
8. emergency Plan…………………………………………………………………………….21
9 Risk assessment 23
10 ENCLOSURES: 24
11 SAFETY, HEALTH ENVIRONMENT: 24
12 QUALITY ASSURANCE AND QUALITY CONTROL 24
PURPOSE
This Document explains the detailed procedure for Erection of Batching Plant using Hydraulic Mobile crane 50T/60T.
SCOPE
This method statement details the erection and commissioning of:
2.1 Batching plant with Silos and Assembly.
REFERENCES DOCUMENTS / SPECIFICATION / STANDARD
3.1 Batching Schwing Stetter M-1T
3.2 SHE conditions of contract.
3.3 SHE manual of contract.
3.4 Project EHS plan.
3.5 Project Quality Plan.
RESPONSIBILITIES:
Following are the responsibilities and reporting structure of personnel involved in the scope of the procedure:
Position
Reporting / Responsibilities
Project Manager
Shall be responsible for safe and timely erection of batching plant in his supervision.
Shall be responsible for assuring quality to be maintained.
Deputy Project Manager
Shall be responsible for control, supervision and direction for implementation and execution of construction plans in regard of erection of batching plant.
Manager (Casting Yard)
Shall also be responsible for supervision of erection of batching plant and other assemblies. Ensuring of construction activities and preparation of records, procedures required to be completed in regard of batching plant erection.
Sr. Engineer (Execution)
Shall report to manager casting yard
Shall be responsible for day-to-
您可能关注的文档
- 学院本科课程评估实施办法及评估指标体系.docx
- 学院本科课程评估指标体系.docx
- 学院教育教学改革研究项目管理办法.docx
- 学院考试工作管理办法.docx
- 学院特色晚自习观影活动策划.docx
- 学院星级宿舍评比标准.docx
- 学院专业共享型教学资源库建设实施方案.docx
- 循环氨水余热回收智能装备成套系统介绍教学PPT课件.pptx
- 循环经济试点单位评估考核内容要求.doc
- 压气机的热力过程 工程热力学教学PPT课件.ppt
- 人教版小学三年级下册道德与法治教学计划.docx
- 专题31:生活中常见的盐(含答案)----中考化学(人教版)总复习.docx
- 《深海奇幻之旅》课件.ppt
- 《深海探索之光:海洋平台简介》课件.ppt
- 2025届高考英语语法专项复习形容词和副词强化练习(含答案).docx
- 专题33:物质之间的相互反应(含答案)----中考化学(人教版)总复习.docx
- 《深空探索》课件.ppt
- 高三年级学科竞赛复习备考方案.docx
- 专题34: 气体的制取(含答案)----中考化学(人教版)总复习.docx
- Starter Unit 2 Keep Tidy单元核心知识点精讲精练(词汇、句型、语音、语法)(解析版).pdf
文档评论(0)