储罐内衬混凝土施工方案.pdfVIP

  • 1
  • 0
  • 约7.07千字
  • 约 8页
  • 2021-01-23 发布于天津
  • 举报
白液贮存槽内衬混凝土施工方案 White Liquor Storage Tank Lining Concreting Program 1.施工前的检查 Checking before Construction (1)储罐的组对和焊接完成后,对储罐的外观进行检查,按照《立 式圆筒型焊接油罐施工及验收规范》 GB50128-2005 的储罐的焊缝、 垂直度和圆度进行复查。 After completing the pairing and welding of the storage tank, check the outlook of the tank, and review the welds, the verticality, and the roundness of the tank in accordance with GB50128-2005 the “Construction and Acceptance Specification for Vertical Cylindrical Welded Oil Tanks ”. (2)对储罐底板焊缝进行抽真空检查。 Make vacuuming checks for the welds on the bottom of the tanks. (3)对储罐进行盛水试验检查。 Check the tanks by filling water. (4 )检查储罐的管道接口和人孔门是否施工完成。 Check whether the construction of the piping interfaces and man-holes of the tanks is completed. 2.白液贮存槽内衬混凝土施工 White liquor storage tank lining concrete construction 2.1 施工前的准备工作 Preparations before construction 2.1.1 储罐壁板钩钉的焊接 Welding the tank wall hooks (1)在储罐壁板用 φ20mm 的螺纹钢弯制成的钩钉焊接,壳体 部分每平方米 6 个钩钉。如图 1-1:On the wall of the tanks, weld with hooks made by bending φ20mm rebar, using 6 hooks for each square meter of the shell body, see Fig. 1-1: 图 Fig 1-1 (2 )在完成盛水试验后,用钢丝轮对壁板进行除锈,要求罐壁 内表面无可见的油脂和污垢, 并且没有附着不牢的氧化皮, 铁锈后油 漆涂层等附着物,壁板表面应显示出金属光泽,达到手工除锈的 St2 级标准。 After completing the filling-water test, de-rust the wall plates with steel wire wheels, requirements: no grease or dirt visible on the interior surface of the tank wall, no oxidized skin that does not attach fast, or other attachments resulting from painting on rust, and the surface of the wall plate should shine with a metallic luster, reaching ST2 standard for manual d

文档评论(0)

1亿VIP精品文档

相关文档