8D-Corrective Action Report
PAGE 2
Customer:
客户名
Today’s Date:
投诉日期
Supplier:
供应商名
Reply Due Date:
报告回复日期
Contact:
Defect code:
NA
Phone number:
Item No.:
品名
Product name
Item Description:
产品描述
Inspected Quantity: 检查数量
Defective Quantity:有缺陷的数量
Defective rate:
Complaint type (IQC or field):
Quantity PO:
Incidences Folio:
TBD
D1 – Team
Supplier sales:
Supplier Engineering:
Supplier QA:
D2 – Full Description of Problem or Nonconformity:
D3 –Containment actions Taken to contain all Suspect Product(Warehouse仓库中 and work-in product生产中 and in transportation运输中 products) /Acciones Contenedoras Tomadas en Corto Plazo:
Location/影响产品所在位置
Qty/数量
Containment actions Taken如何处理
Due Date日期/
Owner负责人:
1. 客户处库存
(客户处负责人)
2. in transportation to Customer
向客户运输途中
3. Supplier Warehouse供应商仓库中
4. work-in product供应商生产中
4. others 其他地方
D4 – Root Cause Analysis (Define how this was determined and prevent) /
Causa raíz de la No conformidad: (Determinar solución o mejoras a realizar):
Brainstorming session, define a list of reasons for the existing problem; Ask why do we have this problem? Use fish bone methods to define areas related to machines, methods, human and materials. 小组头脑风暴讨论后,找出所有导致该问题的因素,该问题为何发生。用鱼骨图从人,机,料,法,环,测(5M1E)各个因素方面分析 最终得到根本原因!
D5 –Corrective Action plan / Acciones correctivas 对策计划拟定(proveedor y/o Steren Ch.)
Due Date日期/ Fecha de implementación
Owner负责人:
6. Perform Permanent Corrective action and Confirm the Effects
实施改善对策并确认有效性
Verification: ok or NG有无不良重发
Due Date日期/ Fecha de implementación
7 – Prevent Action to prevent Recurrence / Prevención de reincidencias:
扩展到其他类似产品 从系统面设计面改善
Standardization or update documents 需要标准化或更新的文件 及完成日期
Due Date日期/ Fecha de implementación
Owner负责人:
8 – Customer QA Verification and closure / Verificación: Passed or Fail.
Method of Verification - / Método de verificación
:
verification PO:
Date Fecha: