Hydraulic Analysis Report - T0306 :
INT-1
Generated by Aspen Plus V9
Simulation case:
C:\Users\lenovo\Desktop\T0306热泵精馏塔详细设计(10.0).bkp
2019/7/ 18
Contents
1. Column Internals Summary 3
2. Feed/Draw Summary 4
3. CS-1 5
3.1. Tray Geometry 5
3.2. Design Parameters7
3.3. Results Summary8
3.4. By Tray Results 10
3.4.1. Hydraulic Results 10
3.4.2. State Conditions 14
3.4.3. Physical Properties 15
3.5. Hydraulic Plots 16
Hydraulic Analysis Report - T0306 : INT-1
User Name: HU GO Job Code: JNDX
Project: 热泵精馏塔水力学校核书 Description:
1. Column Internals Summary
Summary
Property Value Unit
Number of Trayed/Packed stages 18
Total height 10.8 meter
Total head loss (Hot liquid height) 2.4944 meter
Total pressure drop 0.211549 bar
Number of sections 1
Number of diameters 1
Sections
Section Section
Column Start End Diameter Internals Tray or % Approach Limiting
Height Pressure
1
原创力文档