- 1
- 0
- 约1.22千字
- 约 2页
- 2021-05-26 发布于四川
- 举报
Confidential FM-QT-054 Rev.01 Page * Quality Problem Report (QPR) Author: A.Abbasi QUALITY PROBLEM REPORT Field SQE Section Signature Checked by: Approved by: Area Problem: A. Abbasi Resp. Dept.: AZVICO Owner: AZVICO BOX No.: B015908120-Issue Date:07/06/2018 Due Date Reply: 1 week later Class: - Problem Definition : we found inside the cartons?COVER-P/SEAT ADJR TRK FIN RR??, instead of the part noASA. from the partASA Part No:ASA Part Name: COVER-P/SEAT ADJR TRK FIN RR 4. Counter Measures Date (B/P) Resp. 4a. Temporary Measures (S/T): _ Collect parts carefully - AZVICO 2. Immediate containment:- Breakpoint (VIN No.) - 4b. Permanent Measures (L/T): - - - 3a. Process/Part/Design Check: Is correct process followed? Is correct tool being used? Is correct part being used? Are the parts to spec? Are Intructure,Technics,Mechanism and Technology parameter correct? 5. Verification 5a. Verification Method: Visual and tactile 5b. Verification Result: Tracking Vin No.: From ______ To _______ 3b. Root Cause: Validation result: Accept Not Accept Closed Date: Checked by: Approved by: Effective date 22 June 2015 * Page * Confidential
您可能关注的文档
最近下载
- 小学数学教学中数学建模思想与生活问题解决课题报告教学研究课题报告.docx
- 中国糖尿病防治指南(2024版)解读-糖尿病相关技术.pptx
- 建筑工程中途退出协议书.doc VIP
- 勾股定理.1勾股定理课件.ppt VIP
- 结直肠癌放疗护理常规.pptx VIP
- 前臂的挤压伤查房.pptx VIP
- 2025至2030中国匹克球市场前景预判与未来发展形势分析报告.docx VIP
- 2026-2030中国匹克球市场前景预判与未来发展形势分析研究报告.docx
- 2025至2030中国匹克球市场前景预判与未来发展形势分析报告.docx VIP
- 4-1输变电工程施工质量验收统一表式(电缆工程电气专业)-2024年版.docx
原创力文档

文档评论(0)