- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Abstract
The prestressed concrete continuous rigid frame bridge is widely used because of its high strength, lightful line type, convenient and fast construction, long-span ability.
The long-span prestressed concrete continuous rigid frame bridge adopts symmetrical cantilever pouring construction often. During the process of the balanced cantilever construction, the bridge structure is influernced by various factors, such as shrinkage, creep and temperature change of concrete, design parameter and actual difference, construction error, survey error, and so on. Adopting the cantilever pouring construction like this must result in very complicated change of the internal forces and displacements in the bridge. In order to guarantee that the construction quality of the bridge and are safe in construction, and ensure that the girder line shape after the continuous beam bridge be completed and structure internal force accord with the designing requirement, and make the real state that just constructed the bridge in succession conform as much as possible with designed the state, it is indispensable that the bridge construction control.
Based on the analysis summary of domestic and foreign development of large span prestressed concrete continuous rigid frame bridge and the construction control technique, the characteristics and methods of the construction control of long span continuous rigid frame is introduced. Hydropower station of Dadu river mountain S211 and traffic reconstruction project A of Shen Yue river bridge as the engineering background, this paper expounds the grey system theory and establishes a prediction model GM (1 J). It will be regard Shen Yue river bridge project as a grey syste m. In this article, an example is a predicted calculation of Shen Yue river bridge of 9th piece of box girder in 5th pier using GM (1,1) model in order to forecast the change of 9th piece of value calculation of deflection. It concludes that the next phase of template reserves c