技术开发委托合同(中英文对照)教学提纲.docxVIP

  • 4
  • 0
  • 约1.32万字
  • 约 15页
  • 2021-10-24 发布于河北
  • 举报

技术开发委托合同(中英文对照)教学提纲.docx

技术开发委托合同(中英文对照)教学提纲 Technology Development Contract 技术开发〔托付〕合同 Contract No.: P-1309-33 Date:2013-11-08 Entrusting Party 〔Party A〕: 托付方〔甲方〕:Address: 地址: Tel: Fax: Entrusted Party 〔Party B〕: 受托方〔乙方〕: Address: 地址: Tel: Fax: Party A entrust Party B to research and develop Technique Proposal Of Smart T/R Verification System. Party B will develop key circuits verification for the Solution and will be in charge of general thought plan.The following articles are reached and abided by the both parties. 甲方托付乙方设计智能收发验证系统技术方案,乙方将设计开发方案的验证电路及负责整体思路的建立,为此订立以下协议,并由双方共同遵守。 Article 1 Definitions 第一条定义 1.1 Technique Proposal Of Smart T/R Verification System 〔hereinafter referred to as “ the Solution shall mean all the required techniques to construct the general idea which will commit the attached technical requirements. The Solution shall include all technical details of all designing schemes and experimental verification for key circuits. 智能收发验证系统技术方案〔以下简称“方案〞 〕,是指设计满足附件要求的总体技术方案,所需要的解决方案。该解决方案包括全部设计方案资料及关键电路验证技术资料。 1.2Technical documentations shall mean all the necessary documents to design the Solution and all the verification documents that Party B will use in designing the Solution. 技术资料,指研发解决方案所必需的资料,包含乙方在设计方案的过程中,所用法的全部有关验证技术资料。 1.3 “ R 设计技术方案; (2) Key circuits verification; 验证关键电路; (3) Detailed tech ni cal requireme nts see tech nique attachme nt. 具体技术要求见技术协议附件。 2.1.2 Technical Method and Strategy 技术方法和路途: ⑴Should adopt SOC and ASIC technology; 采纳SOC和ASIC技术; (2) Should adopt the smart T/R system to verify the key circuits. 采纳智能收发组件系统对关键电路进展试验验证。 2.2 The obligati ons of both parties 双方义务 2.2.1 Party B shall submit the R 启动阶段:晶圆厂的选定、设计文件的获得、工艺文件的分析、计算机系统的建立、EDA软件的租用及 购置、验证电路与整体方案设计思路的初步沟通; 2) Design phase: module division of chip, principle design, computer simulation, layout design; 设计阶段:芯片的模块划分、原理设计、计算机仿真、幅员设计; 3) Test phase: primary test and con secutive test. 测试阶段:初测及连续测试。 (2) Phase two: Alter the Solution according to the first phase results, and start second run. 其次阶段:依据

文档评论(0)

1亿VIP精品文档

相关文档