工程项目风险评估.docxVIP

  • 69
  • 0
  • 约1.24万字
  • 约 23页
  • 2021-10-28 发布于河北
  • 举报
工程项目风险评估 东北农业大学学士学位论文学号:142022005353004 工程工程风险评估Engineering project risk assessment 同学姓名:王孝霞 指导教师:xxx 所在院系:网络训练学院 所学专业:土木工程 讨论方向: 东北农业大学 中国·哈尔滨 2016年7月 I Abstract Along with our country national economy and accelerating the pace of modernization, the new project number increase rapidly, increasingly large scale, increase investment, construction period lengthen, the harm of project implementation is out of control has become increasingly serious, if not prevent, is likely to be influenced troublefree operation of engineering construction, and even have serious consequences. In view of this, the project risk assessment is particularly important. Project risk is every project, you might encounter in advance to cope with. But at present our country in the aspect of engineering project risk assessment is still in its infancy, research on risk analysis and risk response is still not mature, in this paper, based on introducing the risk identification, this paper expounds the meanings of the engineering project risk assessment, risk identification method to research and risk evaluation methods as the main content, the engineering project risk countermeasure has carried on the preliminary study, puts forward the risk mitigation, risk transfer, risk retention, risk avoidance and risk monitoring five kinds of effective countermeasures against risks. Tried to promote the actual level of engineering project risk management, so the engineering project risk evaluation to promote the development of project management in China is of great importance Key words:Engineering projects, risk identification, risk evaluation, risk countermeasure II 名目 致谢 (13) IV 1 前言 建筑工程是国家根本建立的重要组成局部,建筑业是国民经济的主要支柱产业之一,改革开放20年来,我国建筑业进展很快,建筑市场已初步形成。但是改革开放和国民经济的不断进展,对建筑工程和建筑业提出了更高的要求,为满足这一要求,建筑业进展了一系列重大改革。其中推行施工工程管理是对施工企业最有影响的方面之一。其目的在于通过实行施工工程经理负责制,管理层与作业层分别,内部资源的市场化管理等,推动企业内部的机构调整,最终实现企业从粗放型经营向集约型经营的转变,从速度型向效益型转变,从劳务密集型向劳务密集与技术密集结合型转变。通过这种转变来整体进步施工企业的素养。 建筑工程由于具有投资大、工期长、施工难度大、技术冗杂以及工程参加方众多的特点,在建立过程中不行预见

文档评论(0)

1亿VIP精品文档

相关文档