- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
PLUSPRODUCT LAUNCH SYSTEM产品生产投放系统;Agenda安排
Banner图标
Objectives目标
Milestones Reviews时间节点和回顾
Phase Workbook阶段总结表
Deliverables功能任务
;The PLUS phases, deliverables and milestones that translate product ideas into profitable defect free products are depicted on the PLUS Banner.
PLUS系统中的阶段,任务和时间节点把产品的设计思想转化为有利润空间、无缺陷的最终产品。并在以下图表中描述出来。;Phase 1: Proposal;Phase 2: Design Development;Phase 3: Design Verification;Phase 4: Production Validation ;Phase 5: Launch;Gate Workbook阶段工作表;;Gate Workbook;Gate Workbook;Engineering Deliverables;Updated plans for engineering labor, prototype tooling,
parts and testing compared to approved Engineering Budget.
Attach to approved PD3/PD4, if required.
Outside Service Matrix for Low Cost Country
or External Engineering Resources.
已更新的工程人工,样件及样件模具,测试等计划于已批准的工程
预算做比较。若有需要,附上已批准的PD3/PD4
更新低成本国家外围服务矩阵或外部工程资源;Function, failure modes,
and design controls defined
for system and component levels.
Recommended actions documented
for high RPN‘s.完成对系统和元件功能,
失效模式和设计控制的定义。对高RPN值
项的响应措施归档;ED Layout complete and released in EPIC.工程设计规划完成并在EPIC中发放
ED Layout Checklist shows 100% complete and at least 80% compliant. ED布置检查清单上显示100%完成,并且至少有80%符合要求
Drawing Set - Long leads released in EPIC.在EPIC中发放准备周期长的总成/零部件图纸
Parts Matrix documents plan for release of remaining drawings.零件矩阵确定剩余图纸何时发放;Engineering Deliverables – Drawing Set;Engineering Deliverables – Bill of Materials;Engineering Deliverables – Parts and assembly;Evaluation summary status is GREEN and signed. 评估综述状态为绿色并得到批准;Evaluation summary status is GREEN and signed.评估综述状态为绿色并得到批准;Engineering Deliverables – SSO;Industrial Design Deliverables;3D Design Refinement3为设计改进;Industrial Design Deliverables – Design Theme Development;CSO approved.技术签发批准;Manufacturing Deliverables;Manufacturing Deliverables – Mfg Quote Assumptions;Updated and meets program timing.文件更新并满足项目是间节点
Issues and action plans identified.问题及响应计划制定;Run at Rate completed and passed.
节拍生产成功完成;Manufacturing Deliverables – Process Sign Of
原创力文档


文档评论(0)